Wiki

Mind-upload RQ60 Application Playbook (RQ unit fixed)

Fix submission decisions based on RQ, not general abstracts

Mind Uploading Research Project

Public Page Updated: 2026-04-04 Per-RQ Grant and Dataset Playbook

How to use this page

Read this first to avoid getting lost

This page is a practical playbook that targets each of mind-upload's 60 research questions and fixes the primary application destination/preliminary application destination, main EEG-DATA, reason for hiring, and submitted deliverables.

Best for
People who want to apply for funding and decide on the first experiment for each RQ at the same time
Reading time
20-30 minutes
Accuracy note
A/B/C judgment uses the same criteria as `mind-upload-eeg-rq60-feasibility-and-funds.md`.

Learn the basics

Check the basics in the wiki

What the wiki is for

The wiki is a learning aid. For the project's official current synthesis, success criteria, and operating rules, always return to the public pages.

## How to use 1. Select one `RQ` and fix the `first application destination` and `main EEG-DATA`. 2. Create only the `minimum deliverables` first (expand after completion). 3. `C` judgments do not make performance claims and are submitted in the system/audit design track. 4. Numeric `ID` in this page is for search guidance only. Submission/reproducibility logs must use `DOI + dataset name + access class` in the canonical map `auto-research-funds/wiki/Mind-Upload-EEG-RQ-Grant-Map.md`. ## Fixed map (first application destination/preliminary application destination) - `U0: G2/G3`, `U1: G1/G4`, `U3: G2/G6`, `U4: G1/G4` - `U7: G1/G3`, `U8: G2/G5`, `U10: G2/G6`, `U11: G2/G4` - `U12: G2/G6`, `U13: G1/G4`, `U14: G1/G3`, `U15: G2/G6` ## Current funding reality (2026-03-31 00:04 JST) - `G1/G2` are routing keys used to keep the RQ-level application lanes stable. They are not current grant-card files. - Current grant-card entities are `G3-G6`, and the practical shortlist is now fixed in [AoyamaLab/auto-research-funds wiki: Mind-Upload-Current-Funding-Shortlist](https://github.com/AoyamaLab/auto-research-funds/blob/main/wiki/Mind-Upload-Current-Funding-Shortlist.md). - The six currently revalidated deep-focus RQs are `U13-2`, `U13-5`, `U0-2`, `U0-3`, `U14-4`, and `U14-2`. - The public route is now intentionally concentrated on `inner-speech decoding + identity drift + reproducibility auditing`, with `D10/D03/D01/D02` used as the conservative anchor family. - A March 31 access audit at `2026-03-31 00:20 JST` narrows the current reading: `D10` is the only clearly public-open primary anchor in this family. `D03`, `D02`, and `D01` currently resolve to IEEE DataPort pages that show `LOGIN TO ACCESS DATASET FILES` and `Subscription Required`, so public wording should treat them only as subscription-gated support anchors. - The practical funding bridge for this batch is led by `Nakatani Foundation graduate scholarship` and `Kura Fund`; the `Kashinome Scholarship` stays only as a student-runway side route, and the `Nakatani Foundation research grant` remains a watch-mode route rather than a current open call. - The overnight March 31 recheck still leaves the route unchanged after the latest `EEG-DATA` upstream additions, because those additions do not replace `D10` as the public-open anchor and do not turn `D03/D02/D01` into immediate public routes. - Relevant Todoist tasks for the practical shortlist already existed before this run, and the full-item audit still shows `Kura=2`, `Nakatani family=11`, `Kashinome=2`, and `Secom family=3`, so no new task was created in this run. - For submission-ready references, prefer `Dxx + DOI + dataset name + access class` over numeric search IDs. - The six current public rows below are now synchronized to `Dxx + DOI + dataset name + access class`, so the playbook no longer needs numeric search IDs for `U13-2/U13-5/U0-2/U0-3/U14-4/U14-2`. - `tech_roadmap.md` also contains `U2/U5/U6/U9`, but those roadmap families are not yet translated into this playbook's current `RQ60` practical layer. ## Latest live-source addendum (2026-04-04 22:06 JST) - An actual-pull reread after `mind-upload@39248d59caaa`, `EEG-DATA@7ba2201e2b5`, and `auto-research-funds@f90279417a9f` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; `mind-upload` adds paired-fluid barrier route guidance outside the current six without widening the route, `EEG-DATA` deepens the `IEEE DataPort EEG records` audit while now keeping `30,935` merged-unique rows, `28,898` high-confidence rows, `24,910` immediately usable rows, and `24,540` high-confidence immediate rows, and `auto-research-funds` only relaxes moving-head references without displacing the current practical shortlist. - Route-safe access wording now stays narrow for a clearer reason: `D03 / D02 / D01` still look more open on DOI/DataCite/catalog-side reads than they do on the actual IEEE DataPort landing pages, so `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` remain gated-support planning anchors. - The row-to-theme map also stays fixed one question at a time: `U13-2 -> D10 3M-CPSEED -> Kura Fund / Nakatani Foundation graduate scholarship`, `U13-5 -> D03 with public-open backups -> Kura Fund / Nakatani Foundation graduate scholarship`, `U0-2 / U0-3 -> D02 with ds004148 + ds007216 stress ladders -> Nakatani Foundation graduate scholarship / Kashinome Scholarship`, and `U14-4 / U14-2 -> D01 with D13 rerun support -> Kura Fund / Nakatani Foundation research grant watch / Secom watch`. - Browser-level live checks at `2026-04-04 22:06 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers returned `Last-Modified: Sat, 04 Apr 2026 12:16:08 GMT`, and the checked bodies still surfaced `2026-04-04 17:07 JST` wording on the front door plus `U13-2`, and `2026-04-04 19:09 JST` wording on `U13-5`, before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still stays the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=207`, `projects=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 17:07 JST) - An actual-pull reread after `mind-upload@dc8ec5dc5e62`, `EEG-DATA@f115f11c2da4`, and `auto-research-funds@8d0f5128fcdc` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head splits barrier-side human-proxy roles outside the current six without widening the route, `EEG-DATA` deepens the `EEGIS imagined speech` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, and `24,909` immediately usable rows in the current README snapshot, and `auto-research-funds` adds the `Uehiro ethics foundation` legacy sync while now reporting `8,616` aid IDs, `4,319` rows, and `3,971` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. The barrier-role split tightens outside-current-six route language, the new imagined-speech metadata deepening improves `U13-2` support-space reading, and the funding legacy sync improves adjacent runway hygiene, but none of them changes the current row order. - Browser-level live checks at `2026-04-04 17:07 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers returned `Last-Modified: Sat, 04 Apr 2026 07:12:56 GMT`, and the checked bodies still surfaced `2026-04-04 14:10 JST` wording across all five checked pages before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still stays the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `JSM=0`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 14:10 JST) - An actual-pull reread after `mind-upload@cafeab4bc2a5`, `EEG-DATA@e0695bcac83d`, and `auto-research-funds@a4852d89376c` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, `EEG-DATA` deepens `neuroTUM Cybathlon`, `Zenodo TSA v7.8`, and `poetry EEG` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows, and `auto-research-funds` adds `JELA Diakonia` scholarship cards without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. The glossary/source-status tightening improves front-door discipline, the newest EEG deep dives improve adjacent support-space reading, and the adjacent scholarship expansion improves runway context, but none of them changes the current row order. - Browser-level live checks at `2026-04-04 14:10 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked headers returned `Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT`, and the checked bodies still surfaced `2026-04-04 12:02 JST` wording on the front door plus `2026-04-04 09:05 JST` on the older current-six row packets before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 12:02 JST) - An actual-pull reread after `mind-upload@f84f6e53753b`, `EEG-DATA@017ae806c4dd`, and `auto-research-funds@d4024a5b8a1a` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head synchronizes the EEG recording-frame contract across public pages without widening the route, `EEG-DATA` deep-dives capacity-for-movement EEG datasets while still keeping `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows, and `auto-research-funds` still just carries the earlier `11:04 JST` funding addendum without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. The recording-frame synchronization improves public technical discipline, the movement-capacity deep dive improves adjacent support-space reading, and the funding carry-forward keeps the shortlist readable, but none of them changes the current row order. - Browser-level live checks at `2026-04-04 12:02 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers returned `Last-Modified: Sat, 04 Apr 2026 02:19:09 GMT`, and the checked bodies already surfaced `2026-04-04 11:04 JST` wording on `issue / brief / bridge / playbook` while `u13-2-brain-minus-prior-route.html` still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 11:04 JST) - An actual-pull reread after `mind-upload@812e1650bae1`, `EEG-DATA@1deac45c75a2`, and `auto-research-funds@9741ee45a025` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head tightens glossary bridge-witness terminology without widening the route, `EEG-DATA` collapses duplicate EEG-fMRI override rows and now keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows while leaving the current anchor family unchanged, and `auto-research-funds` adds legacy coverage for current-cycle funding cards without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. The glossary tightening improves front-door reading discipline, the duplicate-override cleanup improves inventory hygiene, and the legacy-card expansion improves runway context, but none of them changes the current row order. - Browser-level live checks at `2026-04-04 11:04 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers returned `Last-Modified: Sat, 04 Apr 2026 01:14:45 GMT`, and the checked bodies still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 09:05 JST) - An actual-pull reread after `mind-upload@e571567f017d`, `EEG-DATA@fbbb0d8c01e0`, and `auto-research-funds@d7f6fb9bc158` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now just carries the earlier `08:07 JST` route-hold sync, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while treating `OpenNeuro ds007020` as a limited rest-side support note and keeping `HeartBEAM` plus figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds deeply reviewed April 4 scholarship updates while still keeping `JGC-S` only as an adjacent runway without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. `OpenNeuro ds007020` remains a limited rest-side note, `HeartBEAM` remains a stronger backup/watch note, and `JGC-S` remains an adjacent runway note. - Browser-level live checks at `2026-04-04 09:05 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked front-door headers returned `Last-Modified: Fri, 03 Apr 2026 23:18:55 GMT`, and the checked bodies already surfaced `2026-04-04 08:07 JST` wording. The current-six row packets returned `Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT` and still surfaced `2026-04-04 01:04 JST` wording before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 08:07 JST) - An actual-pull reread after `mind-upload@418c8f5d0ef9`, `EEG-DATA@dc6d833b83e9`, and `auto-research-funds@58d8738be5d5` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head tightens the front-door human-proxy comparison, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while promoting `HeartBEAM` and figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds the `JGC-S` foreign-student scholarship only as an adjacent runway without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - The refreshed support-space navigation is still useful, but it does not create a row-level replacement for the current-six anchor family or the outside-current-six queue. `HeartBEAM` is worth keeping as a stronger backup/watch note, and `JGC-S` is worth keeping only as an adjacent runway note. - Browser-level live checks at `2026-04-04 08:07 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers returned `Last-Modified: Fri, 03 Apr 2026 22:10:18 GMT`, and the checked bodies still surfaced `2026-04-04 01:04 JST` wording before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 01:04 JST) - An actual-pull reread after `mind-upload@9b6a8b971ba0`, `EEG-DATA@56d765da60b`, and `auto-research-funds@3c8569e28` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now carries the earlier `00:06 JST` reread plus field-level artifact-stack disclosure tightening, `EEG-DATA` deepens the public OpenNeuro metadata for `Numbers` and `PRIOS` while still keeping `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds current coverage for `同盟育成会` and `研究のすゝめ奨学金` without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - `Numbers` and `PRIOS` are worth keeping as support-space notes for symbolic-number and stimulation-response reading, but they still do not replace the present current-six anchor family or the outside-current-six queue. - Browser-level live checks at `2026-04-04 01:04 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers returned `Last-Modified: Fri, 03 Apr 2026 15:13:06 GMT`, and the checked bodies still surfaced `2026-04-04 00:06 JST` wording before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `同盟会=0`, `研究のすゝめ=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-04 00:06 JST) - An actual-pull reread after `mind-upload@84d84fb5a82d`, `EEG-DATA@b468ecc5f8c0`, and `auto-research-funds@eccee095a939` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now just carries the earlier `23:06 JST` route reread addenda, `EEG-DATA` adds `fast mapping semantic integration EEG dataset` while now keeping `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds `Iizuka current card and Korean legacy sync` without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-04 00:06 JST` still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked bodies still surfaced `22:04 JST` on `brief / bridge / U13-2` and `22:04/22:05 JST` on `issue` before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 22:04 JST) - An actual-pull reread after `mind-upload@1ab35b64796f3936e525befb5d9428d789a16263`, `EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a`, and `auto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now just carries the earlier `21:05 JST` route-hold sync, `EEG-DATA` adds `three more deep EEG dataset overrides` while now keeping `30,918` merged-unique rows, `28,881` high-confidence rows, `24,898` immediate rows, and `24,528` high-confidence immediate rows, and `auto-research-funds` now just carries the earlier `21:05 JST` funding addendum without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 22:04 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Fri, 03 Apr 2026 12:24:26 GMT` on those public surfaces, while the checked bodies already surfaced the earlier `21:05 JST` hold note on `issue / brief / bridge / U13-2` before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 23:06 JST) - An actual-pull reread after `mind-upload@ec7a7dd713e9`, `EEG-DATA@46f6b56c693c`, and `auto-research-funds@b3d3c531729a` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now just carries the earlier `22:04 JST` route-hold sync, `EEG-DATA` adds `motion sickness` and `swallowing EEG` datasets while now keeping `30,920` merged-unique rows, `28,883` high-confidence rows, `24,899` immediate rows, and `24,529` high-confidence immediate rows, and `auto-research-funds` deepens `KIRII / Pigeon / Nakato / Takashima` scholarship coverage plus a `22:04 JST` funding addendum without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 23:06 JST` returned `HTTP/2 200` for `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the current `Last-Modified` header was `Fri, 03 Apr 2026 13:18:48 GMT` on those public surfaces, while the front-door pages plus `U13-2` already surfaced `22:04 JST` and the other five row packets still surfaced the earlier `2026-04-02 / 23:08 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 21:05 JST) - An actual-pull reread after `mind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0`, `EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d`, and `auto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now just carries the earlier `20:05 JST` route-hold addendum, `EEG-DATA` adds BDSP manual deep dives for missing EEG datasets while now keeping `30,914` merged-unique rows, `28,877` high-confidence rows, `24,896` immediate rows, and `24,526` high-confidence immediate rows, and `auto-research-funds` now just carries the earlier `20:05 JST` funding addendum without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 21:05 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Fri, 03 Apr 2026 11:17:44 GMT` on those public surfaces, while the checked bodies already surfaced the earlier `20:05 JST` hold note on `issue / brief / bridge` and `11:07 JST` on `U13-2` before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Nakatani family=11`, `G-7=1`, `ENEOS=0`, `Keio graduate scholarship=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 20:05 JST) - An actual-pull reread after `mind-upload@b4fd73d9e98301c918b57541704a95246d69ae09`, `EEG-DATA@649ff098ab577f11065562379150acea1aa07002`, and `auto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now splits human thermal evidence outside the active batch into `passive / task-linked macro thermometry` and `perturbation-conditioned thermal routes`, `EEG-DATA` adds a restricted BDSP Alzheimer `TMS-EEG + rsEEG` resource while now keeping `30,912` merged-unique rows, `28,875` high-confidence rows, and `24,894` directly usable rows, and `auto-research-funds` completes current-card coverage for `ENEOS` and `G-7` without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 20:05 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Fri, 03 Apr 2026 10:19:46 GMT` on those public surfaces, while the checked bodies still surfaced the earlier `11:05/11:07 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 11:05 JST) - An actual-pull reread after `mind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e`, `EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89`, and `auto-research-funds@bfebe94da875d709756746285f133ef30905fd38` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head now tightens `sleep replay integrity / physiology-gate` wording outside the active batch, `EEG-DATA` refreshes its inventory and deep-dives the `COG-BCI` family while now keeping `30,904` merged-unique rows, `28,867` high-confidence rows, and `24,890` directly usable rows, and `auto-research-funds` carries forward the `10:06 JST mind-upload funding addendum` while now reporting `8,596` aid IDs, `4,308` rows, and `3,958` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 11:05 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Fri, 03 Apr 2026 01:31:28 GMT` on those public surfaces, while the checked bodies still surfaced the earlier `05:12 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 05:12 JST) - An actual-pull reread after `mind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed`, `EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1`, and `auto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bc` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head is a `docs: sync github wiki export` carry-forward that keeps exported mirrors aligned without changing the active queue, `EEG-DATA` carries forward a `VR navigation dataset` output refresh on top of a recent `EESM17` metadata deepening while still keeping `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows, and `auto-research-funds` adds `JSPS overseas fellow` current-card snapshots on top of a recent `JSSF research publication` refresh while now reporting `8,594` aid IDs, `4,307` rows, and `3,957` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 05:12 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 19:17:56 GMT` on those public surfaces, while the checked bodies still surfaced the earlier `04:05/04:06 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-03 04:06 JST) - An actual-pull reread after `mind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb`, `EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39`, and `auto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head carries forward a `BCSFB / human-proxy composition` literature sync outside the active batch, `EEG-DATA` keeps `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows after a catalog refresh that does not replace any current anchor family, and `auto-research-funds` refreshes current-card and registry layers around `Itoh domestic scholarship` while now reporting `8,593` aid IDs, `4,306` rows, and `3,956` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-03 04:06 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 18:14:39 GMT` on those public surfaces. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-02 23:08 JST) - An actual-pull reread after `mind-upload@f5d1d1dd1683`, `EEG-DATA@ee1463d28288`, and `auto-research-funds@ec24a355abbc` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head clarifies the causal-versus-human-proxy bridge outside the active batch, `EEG-DATA` refines candidate curation and adds `OpenNeuro ds007615` while now reporting `30,896` merged-unique rows, `28,859` high-confidence rows, and `24,882` directly usable rows in the current README snapshot, and `auto-research-funds` adds `Geo-Kagaku` current cards plus a README-stat refresh without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks at `2026-04-02 23:08 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 13:12:21 GMT` on those public surfaces. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Nakatani Foundation research grant = closed / next-cycle watch (募集期間 2025-06-01 - 2025-07-07)`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Okawa=2`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-02 18:06 JST) - An actual-pull reread after `mind-upload@85b6603b569b`, `EEG-DATA@a7f9390492fd`, and `auto-research-funds@b6c0d0f4eeb7` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head only syncs `U7-2` public bridge wording, `EEG-DATA` deep-dives `OSF gazx2` confidence EEG metadata and `OpenNeuro ds007081` while now reporting `30,892` merged-unique rows, `28,855` high-confidence rows, and `24,880` directly usable rows in the current README snapshot, and `auto-research-funds` refreshes its README summary to `8,590` aid IDs, `4,301` rows, and `3,951` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three anchors. - Browser-level live checks at `2026-04-02 18:06 JST` returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u7-2-timing-metric-route.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 08:22:50 GMT` on those public surfaces. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Okawa=2`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run because the current route and watch route were already covered and the aging-society lane still stays outside the present EEG-first route. ## Latest live-source addendum (2026-04-02 11:09 JST) - An actual-pull reread after `mind-upload@208e59e2180c`, `EEG-DATA@00d85380f3f`, and `auto-research-funds@f4ba35518400` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the current `mind-upload` head is the earlier 10:07 route-hold packet refresh itself, `EEG-DATA` adds public-open speech/listening and auditory-biometric deep dives and now still reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,875` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - The newest public-open adjuncts only tighten row-specific backup coverage rather than replace the current route family: `ds007591` and `ds007602` strengthen speech-side backup options for `U13-2` but still expose only three released participants each, `ChineseEEG-2` strengthens public reading/listening alignment coverage for `U13-5` but still does not expose the intended recall-labeled branch, and PhysioNet `auditory-eeg` is clearly public-open but remains single-day 4-channel coverage rather than a replacement for `D02` in `U0-2 / U0-3`. - Browser-level live checks at `2026-04-02 11:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `mind-upload-rq-solvability-bridge.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 01:22:44 GMT` on those public surfaces. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant = 2026-03-13 - 2026-03-31 12:00 (closed)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Okawa=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-02 10:07 JST) - An actual-pull reread after `mind-upload@be507c810b11`, `EEG-DATA@3f20f48cca6e`, and `auto-research-funds@fb32c05163f4` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head refines EEG foundation setup-equivalence boundaries outside the current six, `EEG-DATA` deep-dives the HBN EEG release 11 route and now reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,871` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - The funding-facing `RQ-by-RQ` deep dossier is also re-synchronized in this run to the same `Dxx + DOI + dataset name + access class` standard used on this page, so the playbook and the funding dossier now point to the same canonical row packets again. - Browser-level live checks at `2026-04-02 10:07 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `mind-upload-rq-solvability-bridge.html`; the current `Last-Modified` header was `Thu, 02 Apr 2026 00:15:06 GMT` on those public surfaces. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant = 2026-03-13 - 2026-03-31 12:00 (closed)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Okawa=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-02 09:05 JST) - An actual-pull reread after `mind-upload@d7f30648fc40`, `EEG-DATA@ac8cc6fc8e74`, and `auto-research-funds@31ec17305f6a` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head tightens a literature myelin-route split outside the current six, `EEG-DATA` adds the `aw8sz` deep dive and now reports `merged_unique=30886`, `high_confidence=28849`, and `access_counts_high.immediate=24500`, and `auto-research-funds` adds the `Aoi graduate scholarship` / `JSSF research grant` merges plus a README-stat refresh to `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - Browser-level live checks at `2026-04-02 09:05 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `mind-upload-rq-solvability-bridge.html`; the current `Last-Modified` header was `Wed, 01 Apr 2026 23:29:12 GMT` on those public surfaces, and the live pages still surfaced the earlier `04:09 JST` / `03:08 JST` reread notes before this source update while keeping the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant = 2026-03-13 - 2026-03-31 12:00 (closed)`. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Okawa=2`), so no new task was added in this run. ## Latest live-source addendum (2026-04-01 20:09 JST) - An actual-pull reread after `mind-upload@da9644095ba6`, `EEG-DATA@1ecc5cdc0131`, and `auto-research-funds@b5cd37febbbb` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` head tightens human-proxy composition evidence roles outside the current six, `EEG-DATA` adds an Iowa Gambling EEG family deep dive but still reports `merged_unique=30873`, `high_confidence=28836`, and `access_counts_high.immediate=24486`, and `auto-research-funds` adds a Nagahisa research-grant snapshot plus repo-stat refresh without displacing the current practical shortlist. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still stricter than the catalog-side identifier surface. - Browser-level live checks at `2026-04-01 20:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `mind-upload-rq-solvability-bridge.html`; the current `Last-Modified` header was `Wed, 01 Apr 2026 10:21:50 GMT` on those public surfaces, and the live `issue.html` paragraph still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant = 2026-03-13 - 2026-03-31 12:00 (closed)`. - A fresh read-only Todoist `api/v1/sync(items)` audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`), so no new task was added in this run. ## Latest live-source addendum (2026-04-01 12:06 JST) - A second actual-pull reread after `mind-upload@9f4bc8e760b1`, `EEG-DATA@1324f9e1ae2b`, and `auto-research-funds@6548b1650535` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `EEG-DATA` head now reports `merged_unique=30867`, `high_confidence=28830`, and `access_counts_high.immediate=24480`, but that remains a metadata-deepening carry-forward rather than an anchor replacement. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 02:26:28 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder. ## Latest live-source addendum (2026-04-01 11:06 JST) - A latest actual-pull reread after `mind-upload@aa21ab9855c1`, `EEG-DATA@cccd137a3468`, and `auto-research-funds@3a691196cb9f` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `EEG-DATA` repository-wide metadata deepening and the newest `auto-research-funds` repo-stat refresh do not displace those anchors or reorder that queue. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; `Last-Modified` advanced to `Wed, 01 Apr 2026 01:21:12 GMT` for `issue.html` / `u8-1` and `Wed, 01 Apr 2026 01:21:13 GMT` for the two bridge pages, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-01 10:19 JST) - A latest actual-pull reread after `mind-upload@d87b9ce`, `EEG-DATA@c05ceda146f8`, and `auto-research-funds@ca65b206cf6d` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` beginner glial-route audit, the newest `EEG-DATA` `OpenNeuro ds006036` deep dive, and the newest `auto-research-funds` `JCS / Takai / Korean scholarship` current-card refresh do not displace those anchors or reorder that queue. - Route-safe access wording still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks at `2026-04-01 10:19 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-01 03:09 JST) - A latest actual-pull reread after `mind-upload@31835fcd8daa`, `EEG-DATA@12eef8ca4ef0`, and `auto-research-funds@040e5b8798fd` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the newest `mind-upload` invasive-language route split, the newest `EEG-DATA` semantic-text-relevance deep dive, and the newest `auto-research-funds` `Obayashi / Yokogaku` card refresh do not displace those anchors or reorder that queue. - Browser-level live checks at `2026-04-01 03:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Latest live-source addendum (2026-04-01 01:06 JST) - A second no-op actual-pull reread after nested `mind-upload@8da02e2e48e0`, `EEG-DATA@e6013384fa01`, and `auto-research-funds@c6a383f07a7b` still leaves this playbook's practical reading unchanged. - The current route still stays fixed on `D10 / D03 / D02 / D01` for the public six and `U7-1 -> U1-2 -> U4-2 -> U8-1` for the outside-current-six queue; the latest upstream deltas do not displace those anchors or reorder that queue. - Browser-level live checks at `2026-04-01 01:06 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `u8-1-closed-loop-delay-tolerance-route.html`, and `mind-upload-rq-solvability-bridge.html`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=204`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this run. ## Latest post-pull addendum (2026-03-31 21:09 JST) - A latest pull reread after `mind-upload@ed6f8203e46d`, `EEG-DATA@20fbbad9959f`, and `auto-research-funds@77f189662745` still leaves this playbook's practical reading unchanged. - The newest pulled deltas still widen support rather than the current route: `mind-upload` tightened dataset-benchmark object rules and clarified the FAQ RNA route split, `EEG-DATA` added request-gated `HBUED` emotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, and `auto-research-funds` added `Teraura Sayoko outbound scholarship`, `Gakusho scholarship`, and README-stat refreshes, but none of those changes displace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 21:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this run. ## Latest post-pull addendum (2026-03-31 19:07 JST) - A latest pull reread after `mind-upload@b7b6c0498ae1`, `EEG-DATA@24e85cc20f09`, and `auto-research-funds@0fddd53bd03c` still leaves this playbook's practical reading unchanged. - The newest pulled deltas still widen support rather than the current route: `mind-upload` strengthened the front-door human-proxy split, `EEG-DATA` refreshed the catalog to `merged_unique=30860`, `high_confidence=28823`, and `access_counts_high.immediate=24471`, and `auto-research-funds` refreshed Kioxia/Takayanagi funding records, but none of those changes displace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 19:09 JST` still returned `200` for `issue.html` and `mind-upload-current-public-six-rq-brief.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant` and `Secom General Research Grant` are already closed for the current cycle. - A fresh Todoist full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this run. ## Latest post-pull addendum (2026-03-31 17:06 JST) - A latest pull reread after `mind-upload@4731680627ff`, `EEG-DATA@3e7a53d9ca8`, and `auto-research-funds@ef2924014a65` still leaves this playbook's practical reading unchanged. - The newest `EEG-DATA` additions widen the support map rather than the current route: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeuro `ds007146` still stays `uncertain_public` because the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage. - Recounting the `### Ux-y` headings in the RQ-by-RQ dossiers still returns `60`, so this run does not widen the queue by flattening the one-RQ-at-a-time route. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`. - The practical funding bridge therefore still stays narrow: `Kura Fund`, `Nakatani Foundation graduate scholarship`, and `Kashinome Scholarship` remain the active bridge for the current six, `Secom General Research Grant` is already closed for the current cycle (`March 31, 2026 at 12:00 JST`) and stays only as a carried-forward watch record, and no new Todoist item was created in this session. ## Latest post-pull addendum (2026-03-31 16:05 JST) - A latest pull reread after `mind-upload@a11240d38415`, `EEG-DATA@f318ac8ce42d`, and `auto-research-funds@c95cc61fdfc9` still leaves this playbook's practical reading unchanged. - The newest deltas widen the support map rather than the current route: `mind-upload` tightened the connectome / timing-state route cards, `EEG-DATA` added an `OSF eucqf` deep-dive refresh, and `auto-research-funds` added new `Takeda / Nohken` funding-card material, but none of those changes displace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so this run adds no new public-site prose. - A fresh Todoist full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom family=3`), so no new task was added in this run. ## Metadata carry-forward addendum (2026-03-31 16:32 JST) - A second post-pull reread after `EEG-DATA@3e7a53d9ca84` still leaves this playbook's practical reading unchanged. - The newest `EEG-DATA` head is a catalog-strengthening carry-forward (`chore: deep-dive NTU and OpenNeuro EEG metadata`) rather than a row-selection change. The refreshed summary now reports `merged_unique=30858`, `high_confidence=28821`, and `access_counts_high.immediate=24469`, which improves the search space for backup families without displacing the active `D10 / D03 / D02 / D01` route family. - The access nuance remains important for submission wording. The refreshed catalog still exposes `D01` through the DOI route as immediate and still keeps `D02` in the immediate/planning bucket, but public-safe wording in this playbook continues to follow the stricter live access audit and therefore keeps `D03 / D02 / D01` as subscription-gated support anchors. - Browser-level live checks in this run still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so there is still no need to widen the public site prose. - A fresh Todoist full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## Anchor-strength recheck (2026-03-30 05:07 JST) This run keeps the same public six-RQ batch and the same practical submission routes. What changed is the access reading for the current anchors after a post-pull `EEG-DATA` reread, a live-site check, an official-window recheck, and a read-only Todoist recheck. `D10` remains the only clearly public-open primary anchor for first artifacts. `D03`, `D02`, and `D01` remain useful only as subscription-gated support anchors, and earlier March 30 notes that called them immediate public routes should now be read as superseded by the March 31 access audit. | RQ | Current anchor class | Funding route to keep now | Why this route still fits | Adjunct before stronger proposal wording | |---|---|---|---|---| | `U13-2` | Strong primary (`D10 3M-CPSEED`) | `Kura Fund` / `Nakatani Foundation graduate scholarship` | Public BIDS speech phases make it the shortest route to a `brain-minus-prior` control story. | Add an external language-evaluation layer and a broader control family. | | `U13-5` | Gated support (`D03`) | `Kura Fund` / `Nakatani Foundation graduate scholarship` | The intended paired EEG + eye-tracking route still bounds a narrow perception-to-transfer branch note, but the current DataPort page is subscription-gated. | Add `D10`, `ZuCo 2.0`, or the public robot-speech EEG family before stronger mechanism language. | | `U0-2` | Gated support (`D02 CSTE`) | `Nakatani Foundation graduate scholarship` / `Kashinome Scholarship` | Cross-session and cross-task biometric structure still makes it the cleanest intended identity-drift floor, but the current DataPort page is subscription-gated. | Add a longer-horizon adjunct with more explicit timing and synchronization logs. | | `U0-3` | Gated support (`D02 CSTE`) | `Nakatani Foundation graduate scholarship` / `Kashinome Scholarship` | The same identity-drift floor still keeps threshold stability and overfit exclusion on one bounded route, but the current DataPort page is subscription-gated. | Add a session-external rerun pack and a larger cohort extension. | | `U14-4` | Gated support (`D01`) | `Kura Fund` / `Nakatani Foundation research grant (watch)` | A latency-first wireless-delay dataset is still enough to force concrete disclosure fields into the rerun contract, but the current DataPort page is subscription-gated. | Add `A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications` for richer rerun examples. | | `U14-2` | Gated support (`D01`) | `Kura Fund` / `Nakatani Foundation research grant (watch)` | The same narrow latency route still supports an operational exploration/confirmation split, but the current DataPort page is subscription-gated. | Add the same public benchmark-style rerun adjunct plus split-violation examples. | - No new Todoist task was needed in this run because the current practical routes were already covered by existing tasks. - `高齢社会課題解決研究(AI)` still remains outside this EEG-first, one-RQ-at-a-time route and therefore stays deferred. ## Current public six after the March 30 official-window and Todoist recheck This run keeps the same public batch and the same funding routes. The only new layer is execution wording: one submission-ready theme, one anchor reason, and one task-status sentence per current row. | RQ | Submission-ready theme | Why the current funder still fits | Main anchor and first deliverable | Task status | |---|---|---|---|---| | `U13-2` | `Neural-contribution audit for imagined speech with a brain-minus-prior control` | `Kura Fund` still fits the bounded young-researcher benchmark route, and `Nakatani Foundation graduate scholarship` still fits the doctoral-track continuity route. | `D10 3M-CPSEED` because the current mirror still preserves an immediate speech-decoding package with overt / silent-intended / imagined speech across `20 participants x 4 sessions`; first deliverable: `brain-minus-prior control table`. | Existing `Kura` and `Nakatani graduate scholarship` start/deadline tasks were rechecked in this run; no new Todoist item was needed. | | `U13-5` | `Perception-to-recall transfer-gap benchmark for mimic separation` | `Kura Fund` still fits the bounded benchmark framing, and `Nakatani Foundation graduate scholarship` still fits the doctoral-track extension because the row remains a narrow mechanism-separation test rather than a solved theory claim. | `D03 Multimodal Fusion EEG + Eye-Tracking` because the intended paired EEG + gaze route still bounds the question, but the current DataPort page is subscription-gated; first deliverable: `perception-to-recall degradation note`. | Existing `Kura` and `Nakatani graduate scholarship` tasks already cover this route; no duplicate task was added. | | `U0-2` | `Temporal-validity-aware identity drift audit with offset, jitter, and state-feature collapse` | `Nakatani Foundation graduate scholarship` still fits the student-facing continuity / biometrics route, while `Kashinome Scholarship` still fits only as a runway-support layer. | `D02 CSTE` because the intended `cross-session / cross-task` biometric benchmark with `10 participants` still bounds the route, but the current DataPort page is subscription-gated; first deliverable: `offset/jitter distribution audit`. | Existing `Nakatani graduate scholarship` and `Kashinome` tasks were rechecked; no new task was needed. | | `U0-3` | `Task-specific threshold stability and overfit-exclusion benchmark for identity drift` | The same `Nakatani graduate scholarship` plus `Kashinome` route still fits because this row remains a bounded doctoral-track threshold-governance problem rather than a broader personhood claim. | `D02 CSTE` on the same identity-drift floor as `U0-2`, but the current DataPort page is subscription-gated; first deliverable: `threshold-stability note and selection rationale`. | Existing `Nakatani graduate scholarship` and `Kashinome` tasks already cover the row; no new task was needed. | | `U14-4` | `Card-integrated reproducibility contract for the current public batch` | `Kura Fund` still fits the immediate young-researcher reproducibility package, while `Nakatani Foundation research grant` remains watch-only because the current cycle is closed. | `D01 Acquisition delay of wireless EEG` because the intended latency-first measurement route still bounds the disclosure package, but the current DataPort page is subscription-gated; first deliverable: `filled Model Card / Dataset Card examples`. | Existing `Kura` tasks and existing `Nakatani research grant` watch tasks were rechecked; no new task was needed. | | `U14-2` | `Exploration-vs-confirmation split contract for reruns` | `Kura Fund` still fits the immediate bounded reproducibility route, while `Nakatani Foundation research grant` remains a next-cycle watch route only. | `D01 Acquisition delay of wireless EEG` on the same latency-first rerun floor as `U14-4`, but the current DataPort page is subscription-gated; first deliverable: `fixed-split rerun contract and negative-case trail`. | Existing `Kura` and `Nakatani research grant` watch tasks already cover the row; no new task was needed. | ## Fixed table by RQ (60 items) | RQ | Judgment | First applicant | Preliminary applicant | Main EEG-DATA | Reason for selecting main data | Minimum deliverables | |---|---|---|---|---:|---|---| | U0-1 | A | G2 (GR-2026-014) | G3 (9Lx4dPK6a4k2gOb7) | 11 | It is easy to track identity changes across sessions in the same framework. | Intervention protocol and rebuttal condition definition | | U0-2 | A | G2 (GR-2026-014) | G3 (9Lx4dPK6a4k2gOb7) | D02 CSTE (10.21227/j162-nh61 / subscription-gated support) | Repeated sessions, cross-task identity labels, and timestamp/QC metadata still make it the cleanest intended anchor for `clock offset + jitter + state-feature collapse` auditing, but the current DataPort page is subscription-gated. | Time synchronization audit report (offset/jitter distribution) | | U0-3 | A | G2 (GR-2026-014) | G3 (9Lx4dPK6a4k2gOb7) | D02 CSTE (10.21227/j162-nh61 / subscription-gated support) | Repeated sessions and cross-task splits still let the threshold-stability and overfit-exclusion route stay on the same identity-drift anchor as `U0-2`, but the current DataPort page is subscription-gated. | Threshold search notebook and selection rationale table | | U0-4 | B | G2 (GR-2026-014) | G3 (9Lx4dPK6a4k2gOb7) | 11 | It is easy to track identity changes across sessions in the same framework. | Identity determination two-axis report (observation match/intervention match) | | U1-1 | A | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 56 | Easy to measure errors and uncertainties of inverse problems under known intervention/high density conditions. | Inverse solution comparison table and uncertainty distribution chart | | U1-2 | A | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 56 | Easy to measure errors and uncertainties of inverse problems under known intervention/high density conditions. | Inverse problem reproduction report (error/uncertainty) | | U1-3 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 56 | Easy to measure errors and uncertainties of inverse problems under known intervention/high density conditions. | Inverse problem reproduction report (error/uncertainty) | | U1-4 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 56 | Easy to measure errors and uncertainties of inverse problems under known intervention/high density conditions. | Inverse solution comparison table and uncertainty distribution chart | | U3-1 | B | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U3-2 | B | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U3-3 | B | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U3-4 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U3-5 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U3-6 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 13 | EEG alone and multimodal condition differences can be easily compared using the same evaluation axis. | Boundary expansion evaluation report (single/integrated comparison) | | U4-1 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 19 | It is easy to separate the difference between correlation and causation by clearly indicating the presence or absence of intervention. | Intervention protocol and rebuttal condition definition | | U4-2 | A | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 19 | It is easy to separate the difference between correlation and causation by clearly indicating the presence or absence of intervention. | Intervention protocol and rebuttal condition definition | | U4-3 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 19 | It is easy to separate the difference between correlation and causation by clearly indicating the presence or absence of intervention. | Intervention protocol and rebuttal condition definition | | U4-4 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 19 | It is easy to separate the difference between correlation and causation by clearly indicating the presence or absence of intervention. | Causal verification report (minimum intervention claim) | | U7-1 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Synchronization, QC, and reproducibility audits can be easily linked directly to operational indicators. | Time synchronization audit report (offset/jitter distribution) | | U7-2 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Synchronization, QC, and reproducibility audits can be easily linked directly to operational indicators. | Time synchronization audit report (offset/jitter distribution) | | U7-3 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Easy to connect synchronization, QC, and reproducibility audits directly to operational indicators. | Reproducibility audit report (synchronization/QC/preprocessing difference) | | U7-4 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Synchronization, QC, and reproducibility audits can be easily linked directly to operational indicators. | Reproducibility audit report (synchronization/QC/preprocessing difference) | | U7-5 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Synchronization, QC, and reproducibility audits can be easily linked directly to operational indicators. | Threshold search notebook and selection rationale table | | U7-6 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 676 | Synchronization, QC, and reproducibility audits can be easily linked directly to operational indicators. | Reproducibility audit report (synchronization/QC/preprocessing difference) | | U8-1 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 6 | Closed-loop KPIs for delay/relearning/safety stop are easy to measure. | Closed loop safety KPI dashboard | | U8-2 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 6 | Closed-loop KPIs for delay/relearning/safety stop are easy to measure. | Closed loop safety KPI dashboard | | U8-3 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 6 | Closed-loop KPIs for delay/relearning/safety stop are easy to measure. | Operational stability report (safety shutdown/recovery time) | | U8-4 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 2412 | Closed-loop abnormal-detection latency, fail-safe trigger, and recovery can be measured in the same contract. | Operational stability report (safety shutdown/recovery time) | | U8-5 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 6 | Closed-loop KPIs for delay/relearning/safety stop are easy to measure. | Closed loop safety KPI dashboard | | U8-6 | B | G2 (GR-2026-014) | G5 (871pw3rLjNPKgqA0) | 6 | Closed-loop KPIs for delay/relearning/safety stop are easy to measure. | Closed loop safety KPI dashboard | | U10-1 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 735 | It is easy to verify the difference between theoretical consistency and physiological proxy step by step. | Theory consistency memo and proxy correlation analysis | | U10-2 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 735 | It is easy to verify the difference between theoretical consistency and physiological proxy step by step. | Theory consistency memo and proxy correlation analysis | | U10-3 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 735 | It is easy to verify the difference between theoretical consistency and physiological proxy step by step. | Theory consistency report (thermodynamic proxy) | | U10-4 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 735 | It is easy to verify the difference between theoretical consistency and physiological proxy step by step. | Theory consistency memo and proxy correlation analysis | | U11-1 | B | G2 (GR-2026-014) | G4 (Drbm6vBRDJkn0NGJ) | 735 | It is easy to preserve the ranking of theoretical indicators and verify failure conditions using state difference data. | Awareness index comparison report (with failure condition) | | U11-2 | C | G2 (GR-2026-014) | G4 (Drbm6vBRDJkn0NGJ) | 735 | It is easy to verify the ranking preservation and failure conditions of theoretical indicators using state difference data. | Theoretical comparison I/O specifications and calculation budget | | U11-3 | B | G2 (GR-2026-014) | G4 (Drbm6vBRDJkn0NGJ) | 735 | It is easy to preserve the ranking of theoretical indicators and verify failure conditions using state difference data. | Awareness index comparison report (with failure condition) | | U11-4 | B | G2 (GR-2026-014) | G4 (Drbm6vBRDJkn0NGJ) | 735 | It is easy to preserve the ranking of theoretical indicators and verify failure conditions using state difference data. | Theoretical comparison I/O specifications and calculation budget | | U12-1 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs to be passed to system issues. | Branch-based audit log design document | | U12-2 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs to be passed to system issues. | System audit requirements table (technical log compatible) | | U12-3 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs to be passed to system issues. | System audit requirements table (technical log compatible) | | U12-4 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs to be passed to system issues. | Branch-based audit log design document | | U12-5 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs that support branch relinking and subject-ID reorganization decisions. | Branch-based audit log design document | | U12-6 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 11 | It is technically easy to maintain audit logs to be passed to system issues. | System audit requirements table (technical log compatible) | | U13-1 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 509 | It is easy to separate semantic restoration and mechanistic difference using control conditions. | Intervention protocol and rebuttal condition definition | | U13-2 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0 / immediate) | Overt/silent/imagined speech plus transcript-aligned phases make it the strongest current `brain-minus-prior` anchor for hallucination and neural-inconsistency auditing. | Mimic separation evaluation script and control condition table | | U13-3 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 509 | It is easy to separate semantic restoration and mechanistic difference using control conditions. | Imitation separation evaluation report (meaning/mechanism) | | U13-4 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 509 | Semantic restoration and mechanistic difference are easy to separate under control conditions. | Intervention protocol and rebuttal condition definition | | U13-5 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120 / subscription-gated support) | Shared EEG plus gaze streams still keep the perception-to-recall branch analysis bounded and make decoder-transfer failure easier to interpret without overstating mechanism preservation, but the current DataPort page is subscription-gated. | Mimic separation evaluation script and control condition table | | U13-6 | B | G1 (GR-2026-013) | G4 (Drbm6vBRDJkn0NGJ) | 509 | It is easy to separate semantic restoration and mechanistic difference using control conditions. | Leak audit results and repartition trail | | U14-1 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 6 | It is easy to fix the operation of supplementary exam contracts, leak audits, and disclosure of negative cases. | Supplementary test operation report (including negative cases) | | U14-2 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18 / subscription-gated support) | A latency-first measurement package is sufficient to keep the exploration/confirmation split and rerun contract narrow, measurable, and public-safe, but the current DataPort page is subscription-gated. | Supplementary test operation report (including negative cases) | | U14-3 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 6 | It is easy to fix the operation of supplementary exam contracts, leak audits, and disclosure of negative cases. | Leak audit results and repartition trail | | U14-4 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18 / subscription-gated support) | The same latency/measurement anchor is enough to wire Model Card and Dataset Card fields into the rerun contract without claiming field-wide standardization, but the current DataPort page is subscription-gated. | Model/Dataset Card template and filled-in examples | | U14-5 | B | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 6 | It is easy to fix the operation of supplementary exam contracts, leak audits, and disclosure of negative cases. | Negative Example Registry First Edition (CSV+Operating Rules) | | U14-6 | A | G1 (GR-2026-013) | G3 (9Lx4dPK6a4k2gOb7) | 6 | It is easy to fix the operation of supplementary exam contracts, leak audits, and disclosure of negative cases. | Fixed container reproduction procedure manual and cost measurement | | U15-1 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 49 | Easy to connect to system audit indicators for safe shutdown and authority management. | System integrated audit report (suspension/renewal conditions) | | U15-2 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 49 | Easy to connect to system audit indicators for safe shutdown and authority management. | System audit requirements table (technical log compatible) | | U15-3 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 49 | Easy to connect to system audit indicators for safe shutdown and authority management. | System audit requirements table (technical log compatible) | | U15-4 | C | G2 (GR-2026-014) | G6 (46z9VPE4wnkrvEJR) | 49 | Easy to connect to system audit indicators for safe shutdown and authority management. | System audit requirements table (technical log compatible) | ## Additional information - This page is a quick guide for "fixing submission operations." Please refer to `mind-upload-eeg-rq60-feasibility-and-funds` for details on the reasons for the decision. - `C` In judgment RQ, limit claims to institutional requirements and audit requirements and avoid excessive performance claims. ## 2026-03-14 19:12 JST Added - Re-scanned 60 RQs and fixed ``first application destination/preliminary application destination/main EEG-DATA/minimum deliverables'' for each RQ. - The number of A/B/C (`17/25/18`) matches the original page. - The purpose of this page is to avoid general summaries and make it possible to immediately execute `1RQ=1 submission decision`. ## 2026-03-15 10:02 JST revalidation log (after main run/pull) - Re-verify in `main` after running `git pull --rebase --autostash` and re-check `RQ_TOTAL=60`. - Compare this page with `mind-upload-rq60-deep-focus-notes.md` and confirm that the breakdown of `A/B/C=17/25/18` matches. - `First application destination/preliminary application destination/main EEG-DATA/minimum deliverables'' of each RQ line is missing `0`, blank `0`. - Grant real ID (`GR-2026-013`, `GR-2026-014`, `9Lx4dPK6a4k2gOb7`, `Drbm6vBRDJkn0NGJ`, `871pw3rLjNPKgqA0`, `46z9VPE4wnkrvEJR`) is `auto-research-funds` Can be referenced on the side. - Continuing the policy: fix `1RQ=1 submission judgment` instead of a general summary, and transfer directly to the application text in RQ units. ## 2026-03-15 12:02 JST re-verification log (fixed confirmation of this run/RQ unit submission decision) - Double-checked `RQ_TOTAL=60` and `A/B/C=17/25/18`, which exactly match `mind-upload-eeg-rq60-feasibility-and-funds.md`. - ``First applicant/Preliminary applicant/Main EEG-DATA/Minimum deliverable'' in all `RQ` lines is missing `0`, blank `0`. - The reference ID of `main EEG-DATA` is `EEG-DATA/eeg_dataset_summary_ja.csv`, and all items exist (missing `0`). - Grant real ID (`GR-2026-013`, `GR-2026-014`, `9Lx4dPK6a4k2gOb7`, `Drbm6vBRDJkn0NGJ`, `871pw3rLjNPKgqA0`, `46z9VPE4wnkrvEJR`) is `auto-research-funds` / All items can be re-referenced with `grant_queue`.

2026-03-15 13:03 JST revalidation log (main run / application playbook consistency check)

2026-03-15 16:03 JST revalidation log (after main run/submodule pull)

2026-03-18 11:20 JST revalidation log (main run / playbook consistency refresh)

2026-03-18 12:08 JST revalidation log (main run / one-RQ execution guard)