Wiki

Wiki: U14-2 fixed-split route packet

A row-specific packet for the exploration-versus-confirmation rerun row

Mind Uploading Research Project

Public Page Updated: 2026-04-04 U14-2 route packet

How to use this page

Read this first to avoid getting lost

This page fixes the current public route for U14-2 at the level of one question, one intended EEG route anchor, one bounded first artifact, and one funding bridge.

Best for
Readers who want the dataset-choice rationale and the honest claim ceiling for the current fixed-split row
Reading time
8-12 minutes
Accuracy note
This page does not claim broad rerun robustness or confirmatory readiness. It only records what the present EEG route can honestly close first.

Learn the basics

Check the basics in the wiki

What the wiki is for

The wiki is a learning aid. For the project's official current synthesis, success criteria, and operating rules, always return to the public pages.

# U14-2 fixed-split route packet This page does not change the current public six-question batch. It makes only the sixth active row more explicit, so readers can see why `U14-2` stays after `U14-4`, why `D01 Acquisition delay of wireless EEG` now stays only as a gated support entry point, and what the next public-safe artifact can honestly close. ## What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 14:10 JST` after `mind-upload@cafeab4bc2a5`, `EEG-DATA@e0695bcac83d`, and `auto-research-funds@a4852d89376c` still keeps `U14-2` sixth and still keeps `D01` only as the planned gated-support split-governance floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement. `mind-upload` tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, `EEG-DATA` still reports `30,930` merged-unique rows, `28,893` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows after the newest metadata deep dives, and `auto-research-funds` adds `JELA Diakonia` scholarship cards without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that `D01` still sets only the latency / split-boundary floor, `D13` still stays the first public-open rerun support family, and `D08` still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned `HTTP/2 200` for the current public entry pages and this row packet with `Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT`; the checked front-door pages already surfaced `2026-04-04 12:02 JST` wording while this row packet still surfaced `2026-04-04 09:05 JST` wording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new Todoist item was justified for this row in this sync. ## What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 09:05 JST` after `mind-upload@e571567f017d`, `EEG-DATA@fbbb0d8c01e0`, and `auto-research-funds@d7f6fb9bc158` still keeps `U14-2` sixth and still keeps `D01` only as the planned gated-support split-governance floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement. `mind-upload` now just carries the earlier `08:07 JST` route-hold sync on top of a recent pretraining-overlap audit, `EEG-DATA` still reports `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows after the `OpenNeuro ds007020` deep dive, and `auto-research-funds` adds deeply reviewed April 4 scholarship updates without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that `D01` still sets only the latency / split-boundary floor, `D13` still stays the first public-open rerun support family, and `D08` still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned `HTTP/2 200` for the current public entry pages and this row packet with `Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT`; the checked front-door pages already surfaced `2026-04-04 08:07 JST` wording while this row packet still surfaced `2026-04-04 01:04 JST` wording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (`items=206`, `projects=2`), so no new Todoist item was justified for this row in this sync. ## What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 01:04 JST` after `mind-upload@9b6a8b971ba0`, `EEG-DATA@56d765da60b`, and `auto-research-funds@3c8569e28` still keeps `U14-2` sixth and still keeps `D01` only as the planned gated-support split-governance floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement. `mind-upload` now carries the earlier `00:06 JST` route reread plus field-level artifact-stack disclosure tightening, `EEG-DATA` still reports `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows after deepening `Numbers` and `PRIOS`, and `auto-research-funds` adds current coverage for `同盟育成会` and `研究のすゝめ奨学金` without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that `D01` still sets only the latency / split-boundary floor, `D13` still stays the first public-open rerun support family, and `D08` still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned `HTTP/2 200` for the current public entry pages and this row packet with `Last-Modified: Fri, 03 Apr 2026 21:11:06 GMT`; the checked row packet still surfaced `Updated: 2026-04-02` before this source sync even though the front-door pages already surfaced the `2026-04-04 01:04 JST` basis. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `同盟会=0`, `研究のすゝめ=0`), so no new Todoist item was justified for this row in this sync. ## What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 23:08 JST` after `mind-upload@f5d1d1dd1683`, `EEG-DATA@ee1463d28288`, and `auto-research-funds@ec24a355abbc` still keeps `U14-2` sixth and still keeps `D01` only as the planned gated-support split-governance floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement. `mind-upload` clarifies the causal-versus-human-proxy bridge outside the current six, `EEG-DATA` now reports `30,896` merged-unique rows, `28,859` high-confidence rows, and `24,882` directly usable rows after candidate-curation refinement plus the `OpenNeuro ds007615` deep dive, and `auto-research-funds` adds `Geo-Kagaku` current cards without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The latest carry-forwards do not change the fact that `D01` still sets only the latency / split-boundary floor, `D13` still stays the first public-open rerun support family, and `D08` still stays the validation-heavy support family kept one step later. - Browser-level live checks still returned `HTTP/2 200` for the current public entry pages with `Last-Modified: Thu, 02 Apr 2026 13:12:21 GMT`, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording. ## What still stays fixed after the 12:04 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 12:04 JST` after `mind-upload@dceb8bc`, `EEG-DATA@04b7fda167e`, and `auto-research-funds@4442e348a` still keeps `U14-2` sixth and still keeps `D01` only as the planned gated-support split-governance floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement. `mind-upload` syncs a spectroscopy front door outside the current six, `EEG-DATA` now reports `30,888` merged-unique rows, `28,851` high-confidence rows, and `24,506` immediate rows after `THINGS-EEG`, an OSF orientation route, and a rat ECoG deep dive, and `auto-research-funds` only refreshes repository stats. - None of those additions replaces the present rerun-entry structure. The newest visual, auditory, and animal carry-forwards do not change the fact that `D01` still sets only the latency / split-boundary floor, `D13` still stays the first public-open rerun support family, and `D08` still stays the validation-heavy support family kept one step later. - Browser-level live checks still returned `200` for the current public entry pages with `Last-Modified: Thu, 02 Apr 2026 02:37:04 GMT`, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording. ## What was rechecked for this row - `D01 Acquisition delay of wireless EEG` still fixes the intended latency-first measurement route, but the current IEEE DataPort page is subscription-gated and its visible package is still a delay/synchronization dataset with `README_en` plus device/run `.mat` files rather than a rerun family by itself. - The current funding bridge remains narrow and unchanged: `Kura Fund` stays first, `Nakatani Foundation research grant` stays next-cycle watch, and `Secom General Research Grant` stays an urgency-watch route only. - The public six-question batch also stays unchanged: `U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2`. ## Why `U14-2` still stays sixth - It is the operational rerun-governance row that should come only after `U14-4` has already made the disclosure fields concrete. - If this row fails, broader confirmatory-readiness wording should stay blocked because the route would still be missing a measurable split boundary. - The row can close a narrow contract artifact with EEG alone before any stronger rerun-robustness language is attempted. ## Why `D01` stays in scope only as a gated support anchor | Candidate | What it helps with | Why it is not the first public anchor | |---|---|---| | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, subscription-gated support) | It still fixes the intended latency-first split boundary, which is enough to keep the `exploration vs confirmation` question in scope if access is available. | The current IEEE DataPort page is subscription-gated, and the visible package is still a latency floor rather than a rerun family, so it no longer counts as an immediate public anchor in this run. | | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications` (`10.17632/vyczny2r4w`, immediate) | It is the first required public-open support family for richer split-violation examples and a broader rerun family once the first contract has been fixed. | It is better as a rerun support family than as the first bounded split anchor, so it stays secondary. | | `D08 Simultaneous human intracerebral stimulation and HD-EEG, ground-truth for source localization methods` (`10.21227/7may-9q56`, immediate) | It gives a stronger validation-style benchmark that may later support more explicit negative-case and rerun-audit examples. | It is too validation-heavy and not as direct a split-governance entry point as the current latency route, so it stays support rather than primary for `U14-2`. | The public-open rerun family and the validation-heavy family should not be read as interchangeable here either. `D13` is the first split-violation example family this row would need next, while `D08` is better kept for stronger validation-style failure trails after the first fixed-split contract is already frozen. ## What the first artifact can honestly close now | Artifact piece | What it closes now | What still stays outside the claim | |---|---|---| | `Fixed-split rerun contract` | A bounded rule for freezing the split between exploratory and confirmatory outputs on the current public route. | Any statement that the route already supports broad confirmatory readiness or rerun robustness. | | `Negative-case trail` | A narrow record of what happens when the split rule is violated or the rerun fails to hold under the fixed contract. | Any claim that a few logged failures already generalize into a field-wide rerun policy. | | `Split-violation checklist` | A public-safe checklist for what evidence must be logged when exploratory outputs are kept outside confirmatory wording. | Any theory-level conclusion that goes beyond the present EEG artifact. | ## First-pass KPI bundle and stop rule | Item | Current row-level fixation | |---|---| | `First-pass KPI bundle` | `fixed-split compliance rate`, `rerun success rate`, `explore-to-confirm carryover gap` | | `Stop rule` | Do not widen this row if split violations remain necessary to preserve the result or if the `explore-to-confirm carryover gap` collapses on rerun. | ## Funding wording that still fits | Route | Submission wording that stays honest | Why it still fits this row | |---|---|---| | `Kura Fund` | `A fixed-split rerun contract for a bounded EEG verification route toward the mind-upload hypothesis` | The row still reads as a young-researcher rerun-discipline package rather than a solved reproducibility claim. | | `Nakatani Foundation research grant` (`next-cycle watch`) | `Exploration-versus-confirmation contract design for bounded EEG reruns` | The row remains plausible only as a later-cycle reproducibility package once the current closed cycle reopens. | | `Secom General Research Grant` (`next-cycle watch only`) | `Latency-aware fixed-split and failure-trail auditing for EEG reruns` | The March 31, 2026 `12:00 JST` deadline has already passed in this run, so the route remains useful only as a carried-forward watch note rather than a live planning lane. | ## External dependency tasks that stay outside this session - `D13`-backed split-violation examples across richer public benchmarks are still needed before the row can support broader rerun wording. - A broader rerun family is still needed before the route can claim stronger confirmatory readiness. - Any broad rerun-robustness or confirmatory-readiness interpretation remains outside the present EEG-only route. ## What changed in this run - The public batch did not change. - The main change in this sync is that `U14-2` now carries the same `2026-04-04 09:05 JST` route basis as the latest front-door reading and records that the live row packet had still been stuck at the earlier `2026-04-04 01:04 JST` wording before this source update. - The row still records the anchor-choice rationale, one compact first-pass KPI bundle, and one explicit stop rule instead of leaving them implicit. - This is still a route-setting update, not a solved-claim update.