Wiki

Mind-upload Current Public Six: EEG Route Brief

A narrow route brief, not a solved-claim update

Mind Uploading Research Project

Public Page Updated: 2026-04-04 Current public six

How to use this page

Read this first to avoid getting lost

This page fixes the current public six-question route at the level of one RQ, one bounded anchor, one first artifact, and one funding sentence.

Best for
Readers who want the present one-question-at-a-time EEG route without overreading the claim
Reading time
8-12 minutes

Learn the basics

Check the basics in the wiki

What the wiki is for

The wiki is a learning aid. For the project's official current synthesis, success criteria, and operating rules, always return to the public pages.

# Mind-upload Current Public Six: EEG Route Brief This page keeps the current public six-question batch readable at the level of `one RQ -> one bounded EEG anchor -> one first artifact -> one funding bridge`. It does **not** announce solved claims. It only states what the current public route is narrow enough to support after a post-pull review of `mind-upload`, `EEG-DATA`, `auto-research-funds`, the live public page, the current official funding windows, and a read-only Todoist recheck. ## What still stays fixed after the 22:06 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 22:06 JST` after `mind-upload@39248d59caaa`, `EEG-DATA@7ba2201e2b5`, and `auto-research-funds@f90279417a9f` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` adds paired-fluid barrier route guidance outside the current six without widening the route, `EEG-DATA` deepens the `IEEE DataPort EEG records` audit while now keeping `30,935` merged-unique rows, `28,898` high-confidence rows, `24,910` immediately usable rows, and `24,540` high-confidence immediate rows, and `auto-research-funds` only relaxes moving-head references without displacing the practical shortlist. - Route-safe access wording therefore now stays narrow in a sharper way: `D03 / D02 / D01` still look more open on DOI/DataCite/catalog-side reads than they do on the actual IEEE DataPort landing pages, so `D10` remains the only clear public-open primary anchor and the next-watch family still stays `D11 / D08 / D05 / D20`. - The three-stack reading also stays explicit rather than generic: `U13-2 / U13-5` remain the speech-side control and transfer-gap pair, `U0-2 / U0-3` remain the identity-drift floor and threshold-governance pair, and `U14-4 / U14-2` remain the card-contract and fixed-split rerun-governance pair. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 12:16:08 GMT`, and the checked bodies still surfaced `2026-04-04 17:07 JST` wording on the front door plus `U13-2`, and `2026-04-04 19:09 JST` wording on `U13-5`, before this source sync. - Official-window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=207`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while tightening why the DOI/catalog view does not by itself promote `D03 / D02 / D01`. ## What still stays fixed after the 17:07 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 17:07 JST` after `mind-upload@dc8ec5dc5e62`, `EEG-DATA@f115f11c2da4`, and `auto-research-funds@8d0f5128fcdc` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` splits barrier-side human-proxy roles outside the current six without widening the route, `EEG-DATA` deepens the `EEGIS imagined speech` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, and `24,909` immediately usable rows in the current README snapshot, and `auto-research-funds` adds the `Uehiro ethics foundation` legacy sync while now reporting `8,616` aid IDs, `4,319` rows, and `3,971` official-source rows without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - The three-stack reading also stays explicit rather than generic: `U13-2 / U13-5` remain the speech-side control and transfer-gap pair, `U0-2 / U0-3` remain the identity-drift floor and threshold-governance pair, and `U14-4 / U14-2` remain the card-contract and fixed-split rerun-governance pair. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 07:12:56 GMT`, and the checked bodies still surfaced `2026-04-04 14:10 JST` wording across all five checked pages before this source sync. - Official-window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `JSM=0`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door and the `U13-2` row packet to the same bounded `17:07 JST` basis. ## What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 14:10 JST` after `mind-upload@cafeab4bc2a5`, `EEG-DATA@e0695bcac83d`, and `auto-research-funds@a4852d89376c` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, `EEG-DATA` deepens `neuroTUM Cybathlon`, `Zenodo TSA v7.8`, and `poetry EEG` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows, and `auto-research-funds` adds `JELA Diakonia` scholarship cards without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - The three-stack reading also stays explicit rather than generic: `U13-2 / U13-5` remain the speech-side control and transfer-gap pair, `U0-2 / U0-3` remain the identity-drift floor and threshold-governance pair, and `U14-4 / U14-2` remain the card-contract and fixed-split rerun-governance pair. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT`, and the checked bodies still surfaced `2026-04-04 12:02 JST` wording on `issue / brief / bridge / playbook` while the older current-six row packets still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the entire current-six row packet set to the same bounded `14:10 JST` basis. ## What still stays fixed after the 12:02 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 12:02 JST` after `mind-upload@f84f6e53753b`, `EEG-DATA@017ae806c4dd`, and `auto-research-funds@d4024a5b8a1a` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` synchronizes the EEG recording-frame contract across public pages without widening the route, `EEG-DATA` deep-dives capacity-for-movement EEG datasets while still keeping `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows, and `auto-research-funds` still just carries the earlier `11:04 JST` funding addendum without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 02:19:09 GMT`, and the checked bodies already surfaced `2026-04-04 11:04 JST` wording on `issue / brief / bridge / playbook` while `u13-2-brain-minus-prior-route.html` still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the first-row packet to the same bounded `12:02 JST` basis. ## What still stays fixed after the 11:04 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 11:04 JST` after `mind-upload@812e1650bae1`, `EEG-DATA@1deac45c75a2`, and `auto-research-funds@9741ee45a025` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` tightens glossary bridge-witness terminology without widening the route, `EEG-DATA` collapses duplicate EEG-fMRI override rows and now keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows while leaving the current `D10 / D03 / D02 / D01` family unchanged, and `auto-research-funds` adds legacy coverage for current-cycle funding cards without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 01:14:45 GMT`, and the checked bodies still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while adding a bounded `11:04 JST` front-door and playbook sync. ## What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 09:05 JST` after `mind-upload@e571567f017d`, `EEG-DATA@fbbb0d8c01e0`, and `auto-research-funds@d7f6fb9bc158` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the earlier `08:07 JST` route-hold sync on top of a recent pretraining-overlap audit, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while treating `OpenNeuro ds007020` as a limited rest-side support note and keeping `HeartBEAM` plus figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds deeply reviewed April 4 scholarship updates while still keeping `JGC-S` only as an adjacent runway without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked front-door headers now returned `Last-Modified: Fri, 03 Apr 2026 23:18:55 GMT`, and the checked bodies already surfaced `2026-04-04 08:07 JST` wording. The current-six row packets returned `Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT` and still surfaced `2026-04-04 01:04 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the current-six row packets to the already-published front door. ## What still stays fixed after the 08:07 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 08:07 JST` after `mind-upload@418c8f5d0ef9`, `EEG-DATA@dc6d833b83e9`, and `auto-research-funds@58d8738be5d5` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` tightens the front-door human-proxy comparison, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while promoting `HeartBEAM` and figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds the `JGC-S` foreign-student scholarship only as an adjacent runway without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - Browser-level live checks before this source sync still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers now returned `Last-Modified: Fri, 03 Apr 2026 22:10:18 GMT`, and the checked bodies still surfaced `2026-04-04 01:04 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads, the newly strengthened `HeartBEAM` / TMS backup note, the adjacent-runway `JGC-S` no-op judgment, and the newer live public headers. ## What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 01:04 JST` after `mind-upload@9b6a8b971ba0`, `EEG-DATA@56d765da60b`, and `auto-research-funds@3c8569e28` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now carries the earlier `00:06 JST` route reread plus field-level artifact-stack disclosure tightening, `EEG-DATA` deepens the public OpenNeuro metadata for `Numbers` and `PRIOS` while still keeping `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds current coverage for `同盟育成会` and `研究のすゝめ奨学金` without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks before this source sync still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers returned `Last-Modified: Fri, 03 Apr 2026 15:13:06 GMT`, and the checked bodies still surfaced `2026-04-04 00:06 JST` wording before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `同盟会=0`, `研究のすゝめ=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, current live bodies, official windows, and Todoist sufficiency check. ## What still stays fixed after the 00:06 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 00:06 JST` after `mind-upload@84d84fb5a82d`, `EEG-DATA@b468ecc5f8c0`, and `auto-research-funds@eccee095a939` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the earlier `23:06 JST` route reread addenda, `EEG-DATA` adds `fast mapping semantic integration EEG dataset` while `summary.json` now reports `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds `Iizuka current card and Korean legacy sync` without replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors, and the next-watch family still stays `D11 / D08 / D05 / D20`. - Browser-level live checks before this source sync still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked bodies still surfaced `22:04 JST` on `brief / bridge / U13-2` and `22:04/22:05 JST` on `issue` rather than a new queue or claim. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, live public bodies, official windows, and Todoist sufficiency check. ## What still stays fixed after the 23:06 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 23:06 JST` after `mind-upload@ec7a7dd713e9`, `EEG-DATA@46f6b56c693c`, and `auto-research-funds@b3d3c531729a` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the earlier `22:04 JST` route-hold sync, `EEG-DATA` adds `motion sickness` and `swallowing EEG` datasets while `summary.json` now reports `30,920` merged-unique rows, `28,883` high-confidence rows, `24,899` immediate rows, and `24,529` high-confidence immediate rows, and `auto-research-funds` deepens `KIRII / Pigeon / Nakato / Takashima` scholarship coverage plus a `22:04 JST` funding addendum without replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; those checked pages returned `Last-Modified: Fri, 03 Apr 2026 13:18:48 GMT`, the front-door pages plus `U13-2` already surfaced `22:04 JST`, and the other five row packets still surfaced the earlier `2026-04-02 / 23:08 JST` hold note before this source sync. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 22:04 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 22:04 JST` after `mind-upload@1ab35b64796f3936e525befb5d9428d789a16263`, `EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a`, and `auto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07` still leaves the public batch and the solve-first order unchanged. - The newest pulled delta is now concentrated in `EEG-DATA`: `summary.json` reports `30,918` merged-unique rows, `28,881` high-confidence rows, `24,898` immediate rows, and `24,528` high-confidence immediate rows after the latest exhaustive refresh, while `mind-upload` and `auto-research-funds` now just carry their earlier `21:05 JST` addenda without replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; those checked pages returned `Last-Modified: Fri, 03 Apr 2026 12:24:26 GMT`, and their route-facing body wording already surfaced `21:05 JST` on `issue / brief / bridge` while `U13-2` still surfaced `21:05 JST` and `11:07 JST`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, and the rest of the watch/closed reading stays unchanged from the `21:05 JST` reread. - A fresh read-only Todoist audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=0`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 21:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 21:05 JST` after `mind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0`, `EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d`, and `auto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the `20:05 JST` route-hold addendum, `EEG-DATA` adds BDSP manual deep dives for missing EEG datasets while now reporting `30,914` merged-unique rows, `28,877` high-confidence rows, `24,896` immediate rows, and `24,526` high-confidence immediate rows, and `auto-research-funds` now just carries the `20:05 JST` funding addendum without replacing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; those checked pages returned `Last-Modified: Fri, 03 Apr 2026 11:17:44 GMT`, and their route-facing body wording already surfaced the earlier `20:05 JST` hold note on `issue / brief / bridge` while `U13-2` still surfaced `11:07 JST`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (2026-03-31 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=205`, `projects=2`, `Nakatani family=11`, `G-7=1`, `ENEOS=0`, `Keio graduate scholarship=2`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 20:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 20:05 JST` after `mind-upload@b4fd73d9e98301c918b57541704a95246d69ae09`, `EEG-DATA@649ff098ab577f11065562379150acea1aa07002`, and `auto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen support space rather than widen the active batch: `mind-upload` now splits human thermal evidence outside the current six into `passive / task-linked macro thermometry` and `perturbation-conditioned thermal routes`, `EEG-DATA` adds a restricted `Transcranial Magnetic Stimulation in Alzheimer's disease-Data` BDSP deep dive while now reporting `30,912` merged-unique rows, `28,875` high-confidence rows, and `24,894` directly usable rows, and `auto-research-funds` completes current-card coverage for `ENEOS` and `G-7` scholarships while now reporting `8,600` aid IDs, `4,308` rows, and `3,959` official-source rows without replacing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; those checked pages returned `Last-Modified: Fri, 03 Apr 2026 10:19:46 GMT`, but their route-facing body wording still surfaced the earlier `11:05/11:07 JST` hold note. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (2026-03-31 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 11:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 11:05 JST` after `mind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e`, `EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89`, and `auto-research-funds@bfebe94da875d709756746285f133ef30905fd38` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch: `mind-upload` now tightens `sleep replay integrity / physiology-gate` wording outside the current six, `EEG-DATA` refreshes its inventory and deep-dives the `COG-BCI` family while now reporting `30,904` merged-unique rows, `28,867` high-confidence rows, and `24,890` directly usable rows, and `auto-research-funds` carries forward the `10:06 JST mind-upload funding addendum` while now reporting `8,596` aid IDs, `4,308` rows, and `3,958` official-source rows without replacing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; those checked pages returned `Last-Modified: Fri, 03 Apr 2026 01:31:28 GMT`, but their route-facing body wording still surfaced the earlier `05:12 JST` hold note. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (2026-03-31 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 05:12 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 05:12 JST` after `mind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed`, `EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1`, and `auto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bc` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch: `mind-upload` is now at a `docs: sync github wiki export` head that keeps the exported route mirrors aligned without changing the active queue, `EEG-DATA` carries forward a `VR navigation dataset` output refresh on top of a recent `EESM17` metadata deepening while still keeping `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows, and `auto-research-funds` adds `JSPS overseas fellow` current-card snapshots on top of a recent `JSSF research publication` refresh while now reporting `8,594` aid IDs, `4,307` rows, and `3,957` official-source rows without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor and keeps `D03 / D02 / D01` as gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 19:17:56 GMT`, while the checked bodies still surfaced the earlier `04:05/04:06 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 04:06 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 04:06 JST` after `mind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb`, `EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39`, and `auto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch: `mind-upload` carries forward a `BCSFB / human-proxy composition` literature sync outside the current six, `EEG-DATA` keeps `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows after a catalog refresh that does not replace any current anchor family, and `auto-research-funds` refreshes current-card and registry layers around `Itoh domestic scholarship` while now reporting `8,593` aid IDs, `4,306` rows, and `3,956` official-source rows without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor and keeps `D03 / D02 / D01` as gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 18:14:39 GMT`. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same: `U13-2 = brain-minus-prior control table`, `U13-5 = perception-to-recall degradation note`, `U0-2 = offset/jitter + state-feature collapse audit`, `U0-3 = threshold-stability note + overfit-exclusion rule`, `U14-4 = filled Model Card / Dataset Card examples`, and `U14-2 = fixed-split rerun contract + negative-case trail`. ## What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 23:08 JST` after `mind-upload@f5d1d1dd1683`, `EEG-DATA@ee1463d28288`, and `auto-research-funds@ec24a355abbc` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route discipline and support space rather than the active claim surface: `mind-upload` clarifies the causal-versus-human-proxy bridge and local-route/proxy boundaries outside the current six, `EEG-DATA` refines EEG candidate curation and adds `OpenNeuro ds007615` while now reporting `30,896` merged-unique rows, `28,859` high-confidence rows, and `24,882` directly usable rows in the current README snapshot, and `auto-research-funds` adds `Geo-Kagaku` current cards plus a README-stat refresh without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor and keeps `D03 / D02 / D01` as gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 13:12:21 GMT`. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集期間 2025-06-01 - 2025-07-07`), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 19:03 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 19:03 JST` after `mind-upload@e1a7e7e2f22c`, `EEG-DATA@a7f9390492fd`, and `auto-research-funds@00cdbaa9a122` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` now deepens the `blood-CSF barrier / choroid-plexus` route split on human neurovascular pages outside the current six, `EEG-DATA` still reports `30,892` merged-unique rows, `28,855` high-confidence rows, and `24,880` directly usable rows in the current README snapshot, and `auto-research-funds` still keeps its latest summary at `8,590` aid IDs, `4,301` rows, and `3,951` official-source rows without replacing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. A direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three support anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u7-2-timing-metric-route.html`; the checked pages returned `Last-Modified: Thu, 02 Apr 2026 09:37:54 GMT`, but their route-facing body wording still surfaced the earlier `18:06 JST` hold note. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check while updating the route-hold wording to the latest pulled heads. ## What still stays fixed after the 18:06 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 18:06 JST` after `mind-upload@85b6603b569b`, `EEG-DATA@a7f9390492fd`, and `auto-research-funds@b6c0d0f4eeb7` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` only syncs `U7-2` public bridge wording, `EEG-DATA` deep-dives `OSF gazx2` confidence EEG metadata and `OpenNeuro ds007081` while now reporting `30,892` merged-unique rows, `28,855` high-confidence rows, and `24,880` directly usable rows in the current README snapshot, and `auto-research-funds` refreshes its README summary to `8,590` aid IDs, `4,301` rows, and `3,951` official-source rows without replacing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. A direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three support anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u7-2-timing-metric-route.html`; the checked pages returned `Last-Modified: Thu, 02 Apr 2026 08:22:50 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync still does **not** widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 11:05 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 11:05 JST` after `mind-upload@208e59e2180c`, `EEG-DATA@00d85380f3fd`, and `auto-research-funds@f4ba35518400` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` refreshes the 10:07 route-hold packets, `EEG-DATA` deep-dives the maintained `ChineseEEG-2` release plus the public `auditory-eeg` family while still reporting `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,875` immediately usable rows, and `auto-research-funds` keeps the same practical shortlist. The new speech-side public-open material strengthens backup reading/listening alignment checks for `U13-2/U13-5`, but it does not replace `D10` as the primary anchor or repair the recall-validity gap under `U13-5`. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. A direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three support anchors. - Browser-level live checks in this run returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages returned `Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the speech-side support reading. It does not widen the current claim surface. ## What still stays fixed after the 11:09 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 11:09 JST` after `mind-upload@208e59e2180c`, `EEG-DATA@00d85380f3f`, and `auto-research-funds@f4ba35518400` still leaves the public batch and the solve-first order unchanged. - The current `mind-upload` head is the earlier 10:07 route-hold packet refresh itself, while the newest upstream movement is on `EEG-DATA`: `chore: deep-dive ChineseEEG-2 and PhysioNet auditory EEG`. The refreshed summary still reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,875` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - The new public-open adjuncts only tighten row-specific backup coverage rather than widen the batch: `ds007591` and `ds007602` strengthen speech-side backup options for `U13-2` but still expose only three released participants each, `ChineseEEG-2` strengthens public reading/listening alignment coverage for `U13-5` but still does not expose the intended recall-labeled branch, and PhysioNet `auditory-eeg` is clearly public-open but remains single-day 4-channel coverage rather than a replacement for `D02` in `U0-2 / U0-3`. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages now returned `Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the backup-family reading after the newest `EEG-DATA` carry-forward. It does not widen the current claim surface. ## What still stays fixed after the 10:07 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 10:07 JST` after `mind-upload@be507c810b11`, `EEG-DATA@3f20f48cca6e`, and `auto-research-funds@fb32c05163f4` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` refines EEG foundation setup-equivalence boundaries outside the current six, `EEG-DATA` deep-dives the HBN EEG release 11 route and now reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,871` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. The row-level reading only tightens inside that unchanged batch: `U13-5` still carries an explicit recall-validity caveat because the visible `D03` metadata still does not expose a recall-specific label, and `U14-4 / U14-2` still keep `D13` as the first public-open rerun support family beyond the current `D01` disclosure floor. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Thu, 02 Apr 2026 00:15:06 GMT`. - This source sync also re-aligns the public-side row wording and the funding-facing `60RQ` dossier wording to the same `Dxx + DOI + dataset name + access class` standard, so the public six now point into the same canonical row packets as the funding repo again. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the row-by-row dossier wording on the public entry pages. It does not widen the current claim surface. ## What still stays fixed after the 09:05 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 09:05 JST` after `mind-upload@d7f30648fc40`, `EEG-DATA@ac8cc6fc8e74`, and `auto-research-funds@31ec17305f6a` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` tightens a literature myelin-route split outside the current six, `EEG-DATA` adds the `aw8sz` deep dive and now reports `merged_unique=30886`, `high_confidence=28849`, and `access_counts_high.immediate=24500`, and `auto-research-funds` carries forward the `Aoi graduate scholarship` / `JSSF research grant` merges plus a README-stat refresh to `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. A direct live-access reread still shows `D03 / D02 / D01` behind `IEEE DataPort` login and subscription gates. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 23:29:12 GMT`, and the live pages still surfaced the earlier `04:09 JST` / `03:08 JST` reread notes before this source update. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface. ## What still stays fixed after the 03:08 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 03:08 JST` after `mind-upload@d391dbede29e`, `EEG-DATA@f9df9ba85a6`, and `auto-research-funds@95f804055809` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` splits ECM / PNN literature routes outside the current six, `EEG-DATA` adds two immediate-access deep-dive candidates (`10.48804/NV4RGL` and `10.7281/T1/B660D2`) without replacing the current anchor family, and `auto-research-funds` adds Gakusho / NII funding merges plus a README-stat refresh without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 17:27:08 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface. ## What still stays fixed after the 00:03 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 00:03 JST` after `mind-upload@cff3abab58e8`, `EEG-DATA@a885ef3f029d`, and `auto-research-funds@0f60872538dc` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` tightens deuterium operating-point wording outside the current six, `EEG-DATA` adds the `DANDI 001187` deep dive and now reports `merged_unique=30875`, `high_confidence=28838`, and `access_counts_high.immediate=24492`, and `auto-research-funds` carries forward the `Isono / Okabe` scholarship refresh without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 14:17:54 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 22:05 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 22:05 JST` after `mind-upload@84e5337`, `EEG-DATA@bbb8d6c63d7`, and `auto-research-funds@5ff33413e` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` clarifies clearance-route labels at the front door outside the current six, `EEG-DATA` refreshes deep-dive metadata while keeping `merged_unique=30873`, `high_confidence=28836`, `access_counts_high.immediate=24487`, and `18,312 / 28,832` experiment-facing rows (`63.51%` coverage), and `auto-research-funds` adds the `Yamaoka graduate scholarship` snapshot plus README-facing stats refresh without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 12:13:54 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 18:05 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 18:05 JST` after `mind-upload@9984d0b`, `EEG-DATA@5fc1df00f07`, and `auto-research-funds@d7092c8e9` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` deepens wearable `OPM / MEG` route synchronization and measurement-stack clarification outside the current six, `EEG-DATA` adds a continuous-pursuit EEG BCI deep dive and now reports `merged_unique=30873`, `high_confidence=28836`, and `access_counts_high.immediate=24486`, its experiment-metadata report still covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` keeps the same practical shortlist after the recent carry-forward scholarship refresh. - The route-safe access reading still stays narrow: the refreshed local `EEG-DATA` catalog keeps widening, but the current public route still reads `D10` as the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 08:22:51 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order before this run's new addendum. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 17:06 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 17:06 JST` after `mind-upload@c5a0550`, `EEG-DATA@82893f6ca6e`, and `auto-research-funds@ec6f7d068` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` deepens astrocyte PET route splits outside the current six, `EEG-DATA` deep-dives the KMI EEG dataset and now reports `merged_unique=30871`, `high_confidence=28834`, and `access_counts_high.immediate=24484`, its experiment-metadata report still covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` adds the `Megachips 2026 scholarship` snapshot plus a README-stat refresh without changing the practical shortlist. - The route-safe access reading still stays narrow: the refreshed local `EEG-DATA` catalog still shows `D03 / D02` as catalog-side immediate rows and `D01` as a mixed immediate/check-needed pair, but the live-access read remains stricter, so `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 07:16:09 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 14:09 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 14:09 JST` after `mind-upload@ccef40f2f7cf`, `EEG-DATA@deefd5f95c6d`, and `auto-research-funds@f5f76c485ccb` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` clarifies presynaptic release-machinery ceilings outside the current six, `EEG-DATA` deepens Mendeley EEG metadata and now reports `merged_unique=30869`, `high_confidence=28832`, and `access_counts_high.immediate=24482`, its new experiment-metadata report now covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` refreshes repo-level stats without changing the practical shortlist. - The route-safe access reading still stays narrow: the refreshed local `EEG-DATA` catalog still shows `D03 / D02` as catalog-side immediate rows and `D01` as a mixed immediate/check-needed pair, but the live-access read remains stricter, so `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 04:20:02 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=5`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 12:06 JST actual-pull reread on April 1, 2026 - A second actual-pull recheck at `2026-04-01 12:06 JST` after `mind-upload@9f4bc8e760b1`, `EEG-DATA@1324f9e1ae2b`, and `auto-research-funds@6548b1650535` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` already keeps the route-hold wording public-safe, `EEG-DATA` now reports `merged_unique=30867`, `high_confidence=28830`, and `access_counts_high.immediate=24480`, and `auto-research-funds` refreshes funding reread documentation without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 02:26:28 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder. ## What still stays fixed after the 11:06 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 11:06 JST` after `mind-upload@aa21ab9855c1`, `EEG-DATA@cccd137a3468`, and `auto-research-funds@3a691196cb9f` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface: `mind-upload` already keeps the route-hold wording public-safe, `EEG-DATA` deepens repository-wide metadata and now reports `merged_unique=30866`, `high_confidence=28829`, and `access_counts_high.immediate=24479`, and `auto-research-funds` refreshes repo-level stats without changing the practical shortlist. - The route-safe access reading still stays narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; `Last-Modified` advanced to `Wed, 01 Apr 2026 01:21:12 GMT` for `issue.html` / `u8-1` and `Wed, 01 Apr 2026 01:21:13 GMT` for the two bridge pages, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 03:09 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 03:09 JST` after `mind-upload@31835fcd8daa`, `EEG-DATA@12eef8ca4ef0`, and `auto-research-funds@040e5b8798fd` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen route support rather than the current claim surface: `mind-upload` split temporal routes for invasive language BCIs outside the current public-six packet, `EEG-DATA` added a semantic-text-relevance deep dive that widens language-related backup coverage without displacing `D10 / D03 / D02 / D01`, and `auto-research-funds` refreshed `Obayashi / Yokogaku` cards without changing the practical current shortlist. - Browser-level live checks at `2026-04-01 03:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant` and `Secom General Research Grant` remain closed/watch outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 01:06 JST live-source recheck on April 1, 2026 - A second no-op actual-pull recheck at `2026-04-01 01:06 JST` after nested `mind-upload@8da02e2e48e0`, `EEG-DATA@e6013384fa01`, and `auto-research-funds@c6a383f07a7b` still leaves the public batch and the solve-first order unchanged. - The current `EEG-DATA` head still supports the same bounded route rather than replacing it: the current-six family `D10 / D03 / D02 / D01` and the outside-current-six family `D11 / D08 / D05 / D20` are all still present in the repo, and public-safe wording still keeps `D10` as the only clear public-open primary while `D03 / D02 / D01` stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks at `2026-04-01 01:06 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `u8-1-closed-loop-delay-tolerance-route.html`, and `mind-upload-rq-solvability-bridge.html`, so this run still keeps the public batch fixed. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=204`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 00:12 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 00:12 JST` after `mind-upload@e53a50b1256d`, `EEG-DATA@48f4814db5da`, and `auto-research-funds@76145d0e3f4c` still leaves the public batch and the solve-first order unchanged. - The current `EEG-DATA` head still supports the same bounded route rather than replacing it: the current-six family `D10 / D03 / D02 / D01` and the outside-current-six family `D11 / D08 / D05 / D20` are all still present in the repo, but public-safe wording continues to keep `D10` as the only clear public-open primary while `D03 / D02 / D01` stay gated-support anchors because the live-access read still remains stricter than the catalog label. - Browser-level live checks at `2026-04-01 00:15 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so this run keeps the public batch fixed and adds only a short reread note to the supporting route pages. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=204`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 21:09 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 21:09 JST` after `mind-upload@ed6f8203e46d`, `EEG-DATA@20fbbad9959f`, and `auto-research-funds@77f189662745` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen support rather than the current public claim surface: `mind-upload` tightened dataset-benchmark object rules and clarified the FAQ RNA route split, `EEG-DATA` added request-gated `HBUED` emotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, and `auto-research-funds` added `Teraura Sayoko outbound scholarship`, `Gakusho scholarship`, and README-stat refreshes, but none of those changes replace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 21:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 19:07 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 19:07 JST` after `mind-upload@b7b6c0498ae1`, `EEG-DATA@24e85cc20f09`, and `auto-research-funds@0fddd53bd03c` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen support rather than the current public claim surface: `mind-upload` strengthened the front-door human-proxy split, `EEG-DATA` refreshed the catalog to `merged_unique=30860`, `high_confidence=28823`, and `access_counts_high.immediate=24471`, and `auto-research-funds` refreshed Kioxia/Takayanagi funding records, but none of those changes replace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 19:09 JST` still returned `200` for `issue.html` and `mind-upload-current-public-six-rq-brief.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant` and `Secom General Research Grant` are already closed for the current cycle. - A fresh read-only Todoist full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 17:06 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 17:06 JST` after `mind-upload@4731680627ff`, `EEG-DATA@3e7a53d9ca8`, and `auto-research-funds@ef2924014a65` still leaves the public batch and the solve-first order unchanged. - The newest `EEG-DATA` additions widen the support map rather than the current route: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeuro `ds007146` adds a large auditory MEG/EEG/Ear-EEG record that still stays `uncertain_public` because the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage. - Recounting the `### Ux-y` headings in the RQ-by-RQ dossiers still returns `60`, so this run does not widen the queue by collapsing rows together. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`. - The practical reading therefore still stays narrow: `Kura Fund`, `Nakatani Foundation graduate scholarship`, and `Kashinome Scholarship` remain the active bridge for the current six, `Secom General Research Grant` is already closed for the current cycle (`March 31, 2026 at 12:00 JST`) and stays only as a carried-forward watch record, and no new Todoist item was created in this session. ## What still stays fixed after the 16:05 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 16:05 JST` after `mind-upload@a11240d38415`, `EEG-DATA@f318ac8ce42d`, and `auto-research-funds@c95cc61fdfc9` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still do not widen the current public claim surface: `mind-upload` tightened the connectome / timing-state route cards, `EEG-DATA` added an `OSF eucqf` deep-dive refresh, and `auto-research-funds` added new `Takeda / Nohken` card material, but none of those changes replace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks in this run still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so this run does not add new prose to the public site. - A fresh Todoist `api/v1/sync(items)` full-item audit still shows the route families already covered (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom family=3`), so no new task was added in this run. - The practical reading therefore stays unchanged: `Kura Fund`, `Nakatani Foundation graduate scholarship`, and `Kashinome Scholarship` remain the active narrow bridge for the current six, while `Secom General Research Grant` and `Nakatani Foundation research grant` stay next-cycle watch routes only. ## What stays fixed on March 31, 2026 - A March 31 post-pull recheck at `2026-03-31 09:04 JST` after `mind-upload@8cc3379`, `EEG-DATA@715ecdf`, and `auto-research-funds@6166f60` still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas widen the map but do not widen the current public claim surface: the astrocyte / SV2A route refinements, the `U1-2` funding-sync packet, and the `Zenodo HEP ERP` deep-dive additions do not replace `D10` or turn `D03/D02/D01` into immediate public anchors. - The outside-current-six headline queue of four also stays unchanged: `U7-1` remains the cleanest public-open `A-tier` follow-up, `U1-2` remains the next narrow inverse-estimation packet, `U4-2` remains the minimal causal-intervention packet, and `U8-1` remains the bounded closed-loop delay-tolerance packet. `U7-2` now sits explicitly beside `U7-1` as the adjacent timing-metric support packet rather than as a headline-queue replacement. If you want the exact row packets, continue with the [U7-1 route packet](/wiki/u7-1-synchronization-contract-route.html), the [U7-2 route packet](/wiki/u7-2-timing-metric-route.html), the [U1-2 route packet](/wiki/u1-2-uncertainty-calibration-route.html), the [U4-2 route packet](/wiki/u4-2-minimal-causal-route.html), and the [U8-1 route packet](/wiki/u8-1-closed-loop-delay-tolerance-route.html). - At `2026-03-31 00:04 JST`, an overnight recheck still leaves the public batch and the solve-first order unchanged. - A March 31 access audit at `2026-03-31 00:20 JST` still leaves the batch unchanged, but it narrows the anchor reading: `D10 3M-CPSEED` remains the only clearly public-open primary anchor in the current six. - `D03 Multimodal Fusion EEG + Eye-Tracking`, `D02 CSTE`, and `D01 Acquisition delay of wireless EEG` currently resolve to IEEE DataPort pages that show `LOGIN TO ACCESS DATASET FILES` and `Subscription Required`, so public wording now keeps them only as subscription-gated support anchors rather than immediate public anchors. - When the live access audit and the catalog auto-label disagree, this page follows the live access audit for public-safe wording and keeps the catalog label only as a planning hint. - `Kura Fund` remains open through April 17, 2026 at 17:00, `Nakatani Foundation graduate scholarship` runs April 1, 2026 through May 25, 2026 at 15:00, and `Kashinome Scholarship` remains open through April 9, 2026. - A March 31 official-window recheck at `2026-03-31 14:07 JST` leaves the practical lanes unchanged, but it does move one clock-sensitive item: the `Secom General Research Grant` is no longer a same-day watch in this run because the March 31, 2026 `12:00 JST` deadline has already passed, so it now stays only as a next-cycle watch record. - A March 31 `14:07 JST` Todoist full-item audit via `api/v1/sync` still shows the current route already covered (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom family=3`), so no new task was added in this run. - Earlier March 30 notes on this page that treated `D03/D02/D01` as immediate public routes should now be read as superseded by the March 31 access audit. - A March 31 cross-repo synthesis also rechecked public-open alternative EEG families for the current six. Those alternatives remain useful as secondary support, but they still do not displace the current `D10/D03/D02/D01` route family or raise the public claim ceiling. - The current row packets now also expose one compact `first-pass KPI bundle + stop rule` per row, so readers can see what would stop the route before the claim widens. - The public batch stays `U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2`. - The execution order stays `U13-2 -> U13-5 -> U0-2 -> U0-3 -> U14-4 -> U14-2`. - `D10 3M-CPSEED` remains the only clearly public-open primary anchor. - `D03 Multimodal Fusion EEG + Eye-Tracking`, `D02 CSTE`, and `D01 Acquisition delay of wireless EEG` remain in scope only as subscription-gated support anchors. - `Kura Fund` remains open through April 17, 2026, `Nakatani Foundation graduate scholarship` runs April 1, 2026 through May 25, 2026 at 15:00, `Kashinome Scholarship` remains open through April 9, 2026, and `Secom General Research Grant` is already closed for the current cycle (`deadline: March 31, 2026 at 12:00 JST`) so it stays only as a next-cycle watch record. ## Row packets after the March 30 post-pull reread The route is unchanged, but each active row now also carries one submission-ready title, one explicit reason why the present EEG anchor is enough for a first artifact, one compact KPI bundle, and one explicit stop rule that keeps the claim narrow. | RQ | Submission-ready title | Why the current EEG anchor is enough now | Funding bridge that still fits | Why the public claim still stays narrow | |---|---|---|---|---| | `U13-2` | `Neural-contribution audit for imagined speech with a brain-minus-prior control` | `D10 3M-CPSEED` still gives a public OpenNeuro route with overt, silent-intended, and imagined speech inside one release, so a decoder can be tested against a bounded `brain-minus-prior` control family instead of a pure language prior. | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | This can separate a narrow decoding artifact from a prior-only shortcut, but it does not establish preserved internal mechanism, preserved identity, or successful mind preservation. | | `U13-5` | `Perception-to-recall transfer-gap benchmark for mimic separation` | `D03 Multimodal Fusion EEG + Eye-Tracking` still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a `55`-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so this row stays only as a gated planning anchor plus an external recall-validity requirement. | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | A shared decoder route can support a bounded transfer-gap note, but it does not by itself justify a stronger preserved-mechanism reading. | | `U0-2` | `Temporal-validity-aware identity drift audit with offset, jitter, and state-feature collapse` | `D02 CSTE` still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording treats it as a gated support anchor rather than an immediate public anchor. | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | This can audit timing and state-feature failure, but it does not settle legal, philosophical, or normative identity continuity. | | `U0-3` | `Task-specific threshold stability and overfit-exclusion benchmark for identity drift` | The same `D02` anchor still fixes the intended threshold-governance floor, but public wording now keeps it only as a subscription-gated support anchor rather than a public-open anchor. | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | A stable threshold can still remain only a bounded benchmark artifact, not a sufficient condition for personhood continuity or branch-identity resolution. | | `U14-4` | `Card-integrated reproducibility contract for the current public batch` | `D01 Acquisition delay of wireless EEG` still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row stays only as a gated support route and needs `D13` before stronger public reproducibility wording. | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | Filled card fields can improve disclosure discipline, but they do not by themselves demonstrate field-wide reproducibility, deployment readiness, or standards adoption. | | `U14-2` | `Fixed-split rerun contract for exploration versus confirmation` | The same `D01` route still marks the intended latency-first split boundary, but the visible package is delay/synchronization-heavy, so public wording keeps it only as a gated support anchor and still needs `D13`-backed rerun examples before stronger confirmatory wording. | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | A fixed split and negative-case trail can bound rerun discipline, but they do not license confirmatory wording for exploratory outputs or broad rerun-robustness claims. | ## Current public six at a glance | RQ | Current question focus | Current anchor | First artifact to close next | Current funding bridge | Keep outside the public claim | |---|---|---|---|---|---| | `U13-2` | Connect hallucination / inconsistency checking to neural decoding evaluation. | `D10 3M-CPSEED` (`10.18112/openneuro.ds006465.v2.0.0`, immediate) | `Brain-minus-prior` control table and mimic-separation note | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | Preserved internal mechanism, preserved identity, or successful mind preservation | | `U13-5` | Freeze where performance branches between perception and recall under a shared decoder. | `D03 Multimodal Fusion EEG + Eye-Tracking` (`10.21227/6106-6120`, subscription-gated support) | Perception-to-recall degradation note and transfer-gap table | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | Any stronger mechanism-preservation reading | | `U0-2` | Fix the timing budget before identity-like wording absorbs measurement error. | `D02 CSTE` (`10.21227/j162-nh61`, subscription-gated support) | Offset/jitter distribution and state-feature collapse audit | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | Legal, philosophical, or normative identity continuity | | `U0-3` | Fix threshold stability only after the timing floor is bounded. | `D02 CSTE` (`10.21227/j162-nh61`, subscription-gated support) | Threshold-stability note and overfit-exclusion rule | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | Treating a stable threshold as sufficient for personhood continuity | | `U14-4` | Turn card fields into a concrete rerun checklist. | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, subscription-gated support) | Filled Model Card / Dataset Card examples | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | Field-wide reproducibility, deployment readiness, or standards adoption | | `U14-2` | Make the exploration / confirmation split operational. | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, subscription-gated support) | Fixed-split rerun contract and negative-case trail | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | Presenting exploratory outputs as confirmatory evidence | ## How to deepen this batch without flattening it - `U13-2 -> U13-5` is still the speech-side contribution stack: first keep `brain-minus-prior` honest on `D10`, then ask where the transfer route breaks when the row moves from perception to recall. - `U0-2 -> U0-3` is still the identity-drift floor: first bound timing error on the `D02` route, then ask whether the threshold survives once the timing floor is fixed. The least-distorting public-open stress tests remain `ds004148` and `ds007216`, but they still stay backup-only. - `U14-4 -> U14-2` is still the reproducibility-contract stack: first turn disclosure fields into filled cards on the `D01` floor, then freeze the exploration-versus-confirmation split. `D13` remains the first public-open rerun family those two rows would need next. - `U7-1 -> U7-2 -> U1-2` now sits just outside the batch as the public-open infrastructure floor: `D11` keeps the synchronization contract readable in public, the adjacent `U7-2` packet fixes which timing errors become release-block metrics on that same `D11` family, and `D08` keeps the inverse-uncertainty route grounded without forcing a batch switch. ## First-pass KPI bundle and stop rule sync This run does not widen the batch. It only makes the current public six explicit enough that each active row now has one KPI bundle and one stop rule before the route is widened or moved into stronger wording. | RQ | First-pass KPI bundle | Stop rule before the row can widen | |---|---|---| | `U13-2` | `semantic alignment`, `brain-minus-prior gap`, `misalignment rate` | Stop if the `brain-minus-prior gap` collapses toward a prior-only baseline or if `misalignment rate` stays unstable across sessions. | | `U13-5` | `perception-to-recall degradation point`, `transfer gap`, `control-condition stability` | Stop if the degradation point and the `transfer gap` fail to stay ordered after the control-family rerun. | | `U0-2` | `clock-offset p95`, `jitter p95`, `state-feature collapse rate` | Stop if re-synchronization does not shrink the drift floor or if `state-feature collapse rate` remains above the bounded ceiling across sessions. | | `U0-3` | `session-out AUC`, `threshold stability`, `overfit-exclusion rate` | Stop if the threshold order flips across sessions or if accepted models remain split-specific after the overfit screen is applied. | | `U14-4` | `required-card fill rate`, `rerun success rate`, `leak-audit coverage` | Stop if fuller cards do not improve rerun traceability or if leak-audit fields remain missing in negative-case examples. | | `U14-2` | `fixed-split compliance rate`, `rerun success rate`, `explore-to-confirm carryover gap` | Stop if split violations remain necessary to preserve the result or if the `explore-to-confirm carryover gap` collapses on rerun. | ## What each row can and cannot solve with EEG right now | RQ | EEG-DATA fact that keeps the row real | What EEG can close now | What still needs outside support | Submission wording that stays honest | |---|---|---|---|---| | `U13-2` | `D10` still gives `20 participants x 4 sessions`, overt / silent-intended / imagined speech, raw BIDS, and phase-split derivatives inside one public release. | A bounded `brain-minus-prior` audit plus a mimic-separation note. | An external language-evaluation layer, a broader leak-control family, and any claim about preserved mechanism or identity. | `Neural-contribution audit for imagined speech with a brain-minus-prior control` | | `U13-5` | `D03` still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a `55`-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so the row now stays only as a gated planning anchor. | A perception-to-recall degradation note and a transfer-gap table. | An external recall-validity layer, a public-open EEG+ET backup family, and any stronger mechanism-preservation wording. | `Perception-to-recall transfer-gap benchmark for mimic separation` | | `U0-2` | `D02` still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. | An `offset / jitter` distribution plus a `state-feature collapse` audit. | Longer-horizon timing logs, larger cohorts, and any legal or philosophical continuity interpretation. | `Temporal-validity-aware identity-drift audit` | | `U0-3` | The same `D02` route still fixes the intended threshold-governance floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. | A threshold-stability note and an overfit-exclusion rule. | A session-external rerun pack, cohort extension, and any personhood-continuity reading. | `Task-specific identity-threshold stability study` | | `U14-4` | `D01` still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row now stays only as a gated support route. | Filled Model Card / Dataset Card examples for the current batch. | `D13`-backed rerun examples, leak-audit exemplars, and any field-wide reproducibility or standards-adoption wording. | `Disclosure-first reproducibility contract package` | | `U14-2` | The same `D01` latency-first route still marks the intended split boundary, but the visible package is delay/synchronization-heavy rather than a stand-alone rerun family, so the row now stays only as a gated support route. | A fixed-split rerun contract and a negative-case trail. | `D13`-backed split-violation examples across richer public benchmarks and any stronger confirmatory-readiness claim. | `Exploration-confirmation split contract for reruns` | ## Best public-open support family when the main anchor is gated These support families do not replace the current gated-support planning anchors. They only show the cleanest public-open backup family for readers who want to inspect what can still be stress-tested without access-gated datasets. | RQ | Best public-open support family | Why it helps | Why it still does not replace the current planning anchor | |---|---|---|---| | `U13-5` | `D10 3M-CPSEED`, `ChineseEEG-2`, `ZuCo 2.0`, `SparrKULee`, and `spoken + imagined robot-speech EEG` | `D10` keeps the speech-side control family public-open, `ChineseEEG-2` adds a maintained reading/listening semantic-alignment family, `ZuCo 2.0` restores a public EEG+ET paired-stream family, `SparrKULee` adds a larger auditory-only decoding benchmark, and the robot-speech route keeps overt/imagination stress tests inspectable without a gated page. | None of them exposes a clean recall-labeled branch point on the public route, so they remain backup-only until recall validity is fixed. | | `U0-2` | `A test-retest resting and cognitive state EEG dataset`, then `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` | They give the strongest public-open retest ladder and the strongest public-open multi-session provenance ladder. | They are strong stress-test families, but they do not replace the direct `cross-session / cross-task biometrics` framing that keeps `D02` primary in planning. | | `U0-3` | `A test-retest resting and cognitive state EEG dataset`, then `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` | They give the cleanest public-open rerun ladder for checking whether the threshold rule survives outside one session or one preprocessing path. | They still do not match the intended identity-drift floor as directly as `D02`, so they remain support rather than replacement. | | `U14-4` | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications`, then `D08 Simultaneous human intracerebral stimulation and HD-EEG` | `D13` is the first required public-open rerun family before stronger disclosure wording, and `D08` is the clearest grounded validation-field family after that. | They are useful only after the first latency/disclosure floor is fixed; neither replaces `D01`, but `D13` is the support family the row would need next. | | `U14-2` | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications`, then `D08 Simultaneous human intracerebral stimulation and HD-EEG` | `D13` is the first required public-open split-violation example family, and `D08` gives a stronger validation-style failure family after that. | They help widen rerun examples later, but they do not replace the latency-first split boundary that keeps `D01` primary in planning. | ## Row-by-row brief ### `U13-2` - Question focus: whether hallucination and consistency checks can be connected to neural decoding evaluation without treating decoder success as a mind-preservation result. - Why `D10` stays the strongest anchor: the local mirror still exposes a public OpenNeuro route with `20 participants x 4 sessions`, overt, silent-intended, and imagined speech inside the same release, plus raw BIDS and phase-split derivatives. - What this anchor is strong enough to close now: a `brain-minus-prior` control family, a narrow mimic-separation note, and a bounded inconsistency audit. - Submission wording that stays honest: `Neural-contribution audit for imagined speech with a brain-minus-prior control`. - What still needs outside support: an external language-evaluation layer and a broader leak-control family before any stronger mechanism wording is allowed. - What still stays outside the claim: preserved internal mechanism, preserved identity, and any stronger mind-upload wording. - If you need the row-specific anchor-choice rationale, read the [U13-2 route packet](/wiki/u13-2-brain-minus-prior-route.html). ### `U13-5` - Question focus: where a shared decoder begins to fail when the route moves from perception to recall. - Why `D03` remains only a gated support route: the intended paired EEG + eye-tracking target is still useful for the row, but the visible IEEE DataPort metadata is a `55`-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so public wording must stay narrower than an immediate-public-anchor reading. - What this anchor is strong enough to close now: a perception-to-recall degradation note and a transfer-gap table that stay explicitly narrow. - Submission wording that stays honest: `Perception-to-recall transfer-gap benchmark for mimic separation`. - What still needs outside support: an external recall-validity layer and a public-open speech/EEG+ET backup family before any shared-mechanism reading is attempted. - What still stays outside the claim: any statement that a shared decoder demonstrates a shared preserved internal mechanism. - If you need the row-specific anchor-choice rationale, read the [U13-5 route packet](/wiki/u13-5-perception-to-recall-route.html). ### `U0-2` - Question focus: how to keep identity-like wording from collapsing into unbounded measurement error. - Why `D02` remains only a gated support floor: the intended dataset is still explicitly cross-session and cross-task and stays tied to `10 participants`, but the current IEEE DataPort page is subscription-gated, so public wording cannot treat it as an immediate public anchor. - What this anchor is strong enough to close now: an `offset / jitter` distribution plus a `state-feature collapse` audit. - Submission wording that stays honest: `Temporal-validity-aware identity-drift audit`. - What still needs outside support: longer-horizon timing logs and larger cohorts before the row can be read as anything more than a bounded drift benchmark. - What still stays outside the claim: legal, philosophical, or normative continuity claims. - If you need the row-specific anchor-choice rationale, read the [U0-2 route packet](/wiki/u0-2-temporal-validity-route.html). ### `U0-3` - Question focus: how to make threshold stability interpretable only after the timing route is already bounded. - Why the same `D02` anchor stays in scope only as gated support: threshold stability remains meaningful only when it sits on the same intended cross-session / cross-task floor as `U0-2`, but the current IEEE DataPort page is subscription-gated, so public wording must stay narrower than an immediate-access reading. - What this anchor is strong enough to close now: a threshold-stability note and an overfit-exclusion rule that stay benchmark-like and narrow. - Submission wording that stays honest: `Task-specific identity-threshold stability study`. - What still needs outside support: a session-external rerun pack and cohort extension before this row can carry anything stronger than a bounded biometric threshold claim. - What still stays outside the claim: treating a stable threshold as sufficient for personhood continuity or branch-identity resolution. - If you need the row-specific anchor-choice rationale, read the [U0-3 route packet](/wiki/u0-3-threshold-stability-route.html). ### `U14-4` - Question focus: how to make disclosure fields concrete enough to matter for reruns. - Why `D01` is still useful only as a bounded entry point: the visible package is a wireless delay and synchronization dataset rather than a rerun benchmark by itself, but it is still enough to force latency and measurement fields into a real Model Card / Dataset Card example without claiming field-wide standardization. - What this anchor is strong enough to close now: filled card examples for the current public batch. - Submission wording that stays honest: `Disclosure-first reproducibility contract package`. - What still needs outside support: `D13`-backed rerun benchmarks and leak-audit exemplars before any broader reproducibility claim is made. - What still stays outside the claim: organizational adoption, field-wide standards uptake, or a broad reproducibility victory statement. - If you need the row-specific anchor-choice rationale, read the [U14-4 route packet](/wiki/u14-4-card-contract-route.html). ### `U14-2` - Question focus: how to make the exploration / confirmation split operational instead of aspirational. - Why the same `D01` anchor still works: the latency-first measurement route is enough to freeze a fixed split plus rerun boundary, but it still needs `D13` as the first public-open rerun family before stronger confirmatory wording is attempted. - What this anchor is strong enough to close now: a fixed-split rerun contract and a negative-case trail that remain explicitly narrow. - Submission wording that stays honest: `Exploration-confirmation split contract for reruns`. - What still needs outside support: `D13`-backed split-violation examples across richer public benchmarks before the row can be read as broader confirmatory readiness. - What still stays outside the claim: broader rerun robustness claims or confirmatory wording for exploratory outputs. - If you need the row-specific anchor-choice rationale, read the [U14-2 route packet](/wiki/u14-2-fixed-split-route.html). ## What this page does not do - It does not replace the wider `60RQ` map. - It does not expand the public batch beyond the current six. - It does not move theory, law, neurorights, or full identity questions into an EEG-only solved state.