Wiki

Mind-upload RQ Solvability Bridge

One question, one anchor family, one funding lane, one stop line

Mind Uploading Research Project

Public Page Updated: 2026-04-04 Current RQ-to-EEG-and-funding bridge

How to use this page

Read this first to avoid getting lost

This page fixes the current deepening queue and the next-watch queue at the level of one research question, one EEG-DATA anchor family, one honest funding theme, and one explicit external-dependency boundary.

Best for
Readers who want to see what EEG can close now, what still stays outside the claim, and which funding lane still fits.
Reading time
10-15 minutes
Accuracy note
This is not a solved-claim update. It records only bounded artifacts that can honestly be closed now under current public-open or gated-support anchors.

Learn the basics

Check the basics in the wiki

What the wiki is for

The wiki is a learning aid. For the project's official current synthesis, success criteria, and operating rules, always return to the public pages.

# Mind-upload RQ Solvability Bridge This page answers one narrow question: for the rows that are actually worth deepening now, what can `EEG-DATA` honestly close, what still needs outside support, and what funding theme still fits without overstating the claim. It does **not** try to re-scan all `60RQ` items at once. The working style on this site is now `deepen one row at a time`, not `summarize everything at the same depth`. ## What still stays fixed after the 22:06 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 22:06 JST` after `mind-upload@39248d59caaa`, `EEG-DATA@7ba2201e2b5`, and `auto-research-funds@f90279417a9f` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` adds paired-fluid barrier route guidance outside the current six without widening the route, `EEG-DATA` deepens the `IEEE DataPort EEG records` audit while now keeping `30,935` merged-unique rows, `28,898` high-confidence rows, `24,910` immediately usable rows, and `24,540` high-confidence immediate rows, and `auto-research-funds` only relaxes moving-head references without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow in one important way: `D03 / D02 / D01` still look more open on DOI/DataCite/catalog-side reads than they do on the actual IEEE DataPort landing pages, so `D10` remains the only clear public-open primary anchor while `D03 / D02 / D01` still stay gated-support anchors in public wording. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the paired-fluid barrier note tightens outside-current-six bridge language, the newest IEEE DataPort catalog audit improves access-status discipline, and the funding wording cleanup keeps the shortlist easier to reuse, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers now returned `Last-Modified: Sat, 04 Apr 2026 12:16:08 GMT`, and the checked bodies still surfaced `2026-04-04 17:07 JST` wording on the front door plus `U13-2`, and `2026-04-04 19:09 JST` wording on `U13-5`, before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still stays the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=207`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while tightening why the DOI/catalog view does not by itself promote `D03 / D02 / D01`. ## What still stays fixed after the 17:07 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 17:07 JST` after `mind-upload@dc8ec5dc5e62`, `EEG-DATA@f115f11c2da4`, and `auto-research-funds@8d0f5128fcdc` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` splits barrier-side human-proxy roles outside the current six without widening the route, `EEG-DATA` deepens the `EEGIS imagined speech` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, and `24,909` immediately usable rows in the current README snapshot, and `auto-research-funds` adds the `Uehiro ethics foundation` legacy sync while now reporting `8,616` aid IDs, `4,319` rows, and `3,971` official-source rows without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the barrier-role split tightens outside-current-six human-proxy discipline, the newest imagined-speech metadata deepening improves speech-side support-space navigation, and the legacy-funding sync improves adjacent runway context, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Sat, 04 Apr 2026 07:12:56 GMT`, and the checked bodies still surfaced `2026-04-04 14:10 JST` wording across all five checked pages before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still stays the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `JSM=0`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, the bridge, the playbook, and the first-row packet to the same bounded `17:07 JST` basis. ## What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 14:10 JST` after `mind-upload@cafeab4bc2a5`, `EEG-DATA@e0695bcac83d`, and `auto-research-funds@a4852d89376c` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, `EEG-DATA` deepens `neuroTUM Cybathlon`, `Zenodo TSA v7.8`, and `poetry EEG` metadata while still keeping `30,930` merged-unique rows, `28,893` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows, and `auto-research-funds` adds `JELA Diakonia` scholarship cards without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the glossary and source-status tightening improve front-door discipline, the newest EEG metadata deep dives improve support-space navigation, and the new adjacent scholarship cards keep runway context readable, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked headers now return `Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT`, and the checked bodies still surfaced `2026-04-04 12:02 JST` wording on the front door plus `2026-04-04 09:05 JST` on the older current-six row packets before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, playbook, and the entire current-six row packet set to the same bounded `14:10 JST` basis. ## What still stays fixed after the 12:02 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 12:02 JST` after `mind-upload@f84f6e53753b`, `EEG-DATA@017ae806c4dd`, and `auto-research-funds@d4024a5b8a1a` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` synchronizes the EEG recording-frame contract across public pages without widening the route, `EEG-DATA` deep-dives capacity-for-movement EEG datasets while still keeping `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows, and `auto-research-funds` still just carries the earlier `11:04 JST` funding addendum without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the recording-frame tightening improves front-door technical discipline, the movement-capacity deep dive improves support-space navigation, and the funding carry-forward keeps the shortlist readable, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Sat, 04 Apr 2026 02:19:09 GMT`, and the checked bodies already surfaced `2026-04-04 11:04 JST` wording on `issue / brief / bridge / playbook` while `u13-2-brain-minus-prior-route.html` still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, playbook, and the first-row packet to the same bounded `12:02 JST` basis. ## What still stays fixed after the 11:04 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 11:04 JST` after `mind-upload@812e1650bae1`, `EEG-DATA@1deac45c75a2`, and `auto-research-funds@9741ee45a025` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` tightens glossary bridge-witness terminology without widening the route, `EEG-DATA` collapses duplicate EEG-fMRI override rows and now keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,908` immediate rows, and `24,538` high-confidence immediate rows while leaving the current `D10 / D03 / D02 / D01` family unchanged, and `auto-research-funds` adds legacy coverage for current-cycle funding cards without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the duplicate-override cleanup improves inventory hygiene, the glossary tightening improves front-door reading discipline, and the legacy-card expansion improves funding context, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Sat, 04 Apr 2026 01:14:45 GMT`, and the checked bodies still surfaced `2026-04-04 09:05 JST` wording before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while adding a bounded `11:04 JST` front-door and playbook sync. ## What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 09:05 JST` after `mind-upload@e571567f017d`, `EEG-DATA@fbbb0d8c01e0`, and `auto-research-funds@d7f6fb9bc158` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` now just carries the earlier `08:07 JST` route-hold sync on top of a recent pretraining-overlap audit, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while treating `OpenNeuro ds007020` as a limited rest-side support note and keeping `HeartBEAM` plus figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds deeply reviewed April 4 scholarship updates while still keeping `JGC-S` only as an adjacent runway without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: `OpenNeuro ds007020` stays a limited rest-side note, `HeartBEAM` stays a stronger backup/watch candidate, and figshare `EEG at rest and with TMS` stays a narrow perturbation backup, but none of them repairs the recall-validity gap under `U13-5`, replaces the cross-session identity-drift floor under `U0-2 / U0-3`, or displaces the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked front-door headers now return `Last-Modified: Fri, 03 Apr 2026 23:18:55 GMT`, and the checked bodies already surfaced `2026-04-04 08:07 JST` wording. The current-six row packets returned `Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT` and still surfaced `2026-04-04 01:04 JST` wording before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue while aligning the current-six row packets to the already-published front door. ## What still stays fixed after the 08:07 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 08:07 JST` after `mind-upload@418c8f5d0ef9`, `EEG-DATA@dc6d833b83e9`, and `auto-research-funds@58d8738be5d5` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` tightens the front-door human-proxy comparison, `EEG-DATA` still keeps `30,929` merged-unique rows, `28,892` high-confidence rows, `24,909` immediate rows, and `24,539` high-confidence immediate rows while promoting `HeartBEAM` and figshare `EEG at rest and with TMS` only as backup families, and `auto-research-funds` adds the `JGC-S` foreign-student scholarship only as an adjacent runway without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: `HeartBEAM` is useful as a stronger backup/watch candidate, but it still does not repair the recall-validity gap under `U13-5`, replace the cross-session identity-drift floor under `U0-2 / U0-3`, or displace the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 22:10:18 GMT`, while the checked bodies still surfaced the earlier `2026-04-04 01:04 JST` wording before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` still reads as the annual `mid-January to early-April` window and continues to be handled as the `2026-04-09` must-arrive side route, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `Doumei=0`, `Kenkyu no Susume=0`), so no new task was added in this session. ## What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 01:04 JST` after `mind-upload@9b6a8b971ba0`, `EEG-DATA@56d765da60b`, and `auto-research-funds@3c8569e28` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement: `mind-upload` now carries the earlier `00:06 JST` route reread plus field-level artifact-stack disclosure tightening, `EEG-DATA` deepens the public OpenNeuro metadata for `Numbers` and `PRIOS` while still keeping `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds current coverage for `同盟育成会` and `研究のすゝめ奨学金` without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow: `D10` remains the only clear public-open primary anchor, while `D03 / D02 / D01` still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: `Numbers` and `PRIOS` improve support-space specificity, but they do not repair the recall-validity gap under `U13-5`, replace the cross-session identity-drift floor under `U0-2 / U0-3`, or displace the current `D11 / D08 / D05 / D20` next-watch family. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 15:13:06 GMT`, while the checked bodies still surfaced the earlier `2026-04-04 00:06 JST` wording before this source sync. - Official-window spot checks keep the same practical bridge: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Nakatani Foundation research grant = closed / next-cycle watch`, and `Secom General Research Grant = closed (2026-03-31 12:00 JST)`. - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`, `同盟会=0`, `研究のすゝめ=0`), so no new task was added in this session. ## What still stays fixed after the 00:06 JST actual-pull reread on April 4, 2026 - An actual-pull recheck at `2026-04-04 00:06 JST` after `mind-upload@84d84fb5a82d`, `EEG-DATA@b468ecc5f8c0`, and `auto-research-funds@eccee095a939` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the earlier `23:06 JST` route reread addenda, `EEG-DATA` adds `fast mapping semantic integration EEG dataset` while `summary.json` now reports `30,921` merged-unique rows, `28,884` high-confidence rows, `24,900` immediate rows, and `24,530` high-confidence immediate rows, and `auto-research-funds` adds `Iizuka current card and Korean legacy sync` without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks before this source sync still returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, `u13-2-brain-minus-prior-route.html`, and `u13-5-perception-to-recall-route.html`; the checked bodies still surfaced `22:04 JST` on `brief / bridge / U13-2` and `22:04/22:05 JST` on `issue` rather than a new queue or claim. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch, and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, the latest live public bodies, official windows, and Todoist sufficiency check. ## What still stays fixed after the 23:06 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 23:06 JST` after `mind-upload@ec7a7dd713e9`, `EEG-DATA@46f6b56c693c`, and `auto-research-funds@b3d3c531729a` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the earlier `22:04 JST` route-hold sync, `EEG-DATA` adds `motion sickness` and `swallowing EEG` datasets while `summary.json` now reports `30,920` merged-unique rows, `28,883` high-confidence rows, `24,899` immediate rows, and `24,529` high-confidence immediate rows, and `auto-research-funds` deepens `KIRII / Pigeon / Nakato / Takashima` scholarship coverage plus a `22:04 JST` funding addendum without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, `mind-upload-eeg-rq60-grant-dataset-playbook.html`, and the current-six row packets; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 13:18:48 GMT`, the front-door pages plus `U13-2` already surfaced `22:04 JST`, and the other five row packets still surfaced the earlier `2026-04-02 / 23:08 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch, and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist audit still showed enough route coverage (`items=206`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=1`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, live row packets, official windows, and Todoist sufficiency check. ## What still stays fixed after the 22:04 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 22:04 JST` after `mind-upload@1ab35b64796f3936e525befb5d9428d789a16263`, `EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a`, and `auto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled delta is now concentrated in `EEG-DATA`: `summary.json` reports `30,918` merged-unique rows, `28,881` high-confidence rows, `24,898` immediate rows, and `24,528` high-confidence immediate rows after the latest exhaustive refresh, while `mind-upload` and `auto-research-funds` now just carry their earlier `21:05 JST` addenda without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 12:24:26 GMT`, while the checked bodies already surfaced `21:05 JST` on `issue / brief / bridge` and `21:05 JST` plus `11:07 JST` on `U13-2` before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), and the rest of the watch/closed reading stays unchanged from the `21:05 JST` reread. - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `Keio graduate scholarship=2`, `G-7=1`, `ENEOS=0`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 21:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 21:05 JST` after `mind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0`, `EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d`, and `auto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement: `mind-upload` now just carries the `20:05 JST` route-hold addendum, `EEG-DATA` adds BDSP manual deep dives for missing EEG datasets while now reporting `30,914` merged-unique rows, `28,877` high-confidence rows, `24,896` immediate rows, and `24,526` high-confidence immediate rows, and `auto-research-funds` now just carries the `20:05 JST` funding addendum without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 11:17:44 GMT`, while the checked bodies already surfaced the earlier `20:05 JST` hold note on `issue / brief / bridge` and `11:07 JST` on `U13-2` before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Nakatani family=11`, `G-7=1`, `ENEOS=0`, `Keio graduate scholarship=2`), so no new task was added in this session. - This source sync still does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 20:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 20:05 JST` after `mind-upload@b4fd73d9e98301c918b57541704a95246d69ae09`, `EEG-DATA@649ff098ab577f11065562379150acea1aa07002`, and `auto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support space rather than widen the present bridge: `mind-upload` now splits human thermal evidence outside the current six into `passive / task-linked macro thermometry` and `perturbation-conditioned thermal routes`, `EEG-DATA` adds a restricted `Transcranial Magnetic Stimulation in Alzheimer's disease-Data` BDSP deep dive while now reporting `30,912` merged-unique rows, `28,875` high-confidence rows, and `24,894` directly usable rows, and `auto-research-funds` completes current-card coverage for `ENEOS` and `G-7` scholarships while still reporting `8,600` aid IDs, `4,308` rows, and `3,959` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 10:19:46 GMT`, while the checked bodies still surfaced the earlier `11:05/11:07 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=205`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 11:05 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 11:05 JST` after `mind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e`, `EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89`, and `auto-research-funds@bfebe94da875d709756746285f133ef30905fd38` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge: `mind-upload` now tightens `sleep replay integrity / physiology-gate` wording outside the current six, `EEG-DATA` refreshes its inventory and deep-dives the `COG-BCI` family while now reporting `30,904` merged-unique rows, `28,867` high-confidence rows, and `24,890` directly usable rows, and `auto-research-funds` carries forward the `10:06 JST mind-upload funding addendum` while now reporting `8,596` aid IDs, `4,308` rows, and `3,958` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Fri, 03 Apr 2026 01:31:28 GMT`, while the checked bodies still surfaced the earlier `05:12 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 05:12 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 05:12 JST` after `mind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed`, `EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1`, and `auto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bc` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge: `mind-upload` is now at a `docs: sync github wiki export` head that keeps the exported route mirrors aligned without changing the active queue, `EEG-DATA` carries forward a `VR navigation dataset` output refresh on top of a recent `EESM17` metadata deepening while still keeping `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows, and `auto-research-funds` adds `JSPS overseas fellow` current-card snapshots on top of a recent `JSSF research publication` refresh while now reporting `8,594` aid IDs, `4,307` rows, and `3,957` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 19:17:56 GMT`, while the checked bodies still surfaced the earlier `04:05/04:06 JST` hold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 04:06 JST actual-pull reread on April 3, 2026 - An actual-pull recheck at `2026-04-03 04:06 JST` after `mind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb`, `EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39`, and `auto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge: `mind-upload` carries forward the `BCSFB / human-proxy composition` literature sync outside the current six, `EEG-DATA` keeps `30,900` merged-unique rows, `28,863` high-confidence rows, and `24,885` directly usable rows after a catalog refresh that does not replace any current anchor family, and `auto-research-funds` refreshes current-card and registry layers around `Itoh domestic scholarship` while now reporting `8,593` aid IDs, `4,306` rows, and `3,956` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 18:14:39 GMT`. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Kashinome Scholarship` stays a student-runway side route (`2026-01-14 - 2026-04-09 must arrive`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集を終了しました` on the current public page), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 23:08 JST` after `mind-upload@f5d1d1dd1683`, `EEG-DATA@ee1463d28288`, and `auto-research-funds@ec24a355abbc` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen route discipline and support space rather than widen the present bridge: `mind-upload` clarifies the causal-versus-human-proxy bridge and local-route/proxy boundaries outside the current six, `EEG-DATA` refines EEG candidate curation and adds `OpenNeuro ds007615` while now reporting `30,896` merged-unique rows, `28,859` high-confidence rows, and `24,882` directly usable rows in the current README snapshot, and `auto-research-funds` adds `Geo-Kagaku` current cards plus a README-stat refresh without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns `D03 / D02 / D01` into immediate public anchors, so public-safe wording still keeps `D10` as the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks in this run returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u13-2-brain-minus-prior-route.html`; the checked headers now return `Last-Modified: Thu, 02 Apr 2026 13:12:21 GMT`. - Official window spot checks in this run still keep the practical bridge narrow: `Kura Fund` remains open (`2026-02-02 - 2026-04-17 17:00`), `Nakatani Foundation graduate scholarship` remains open (`2026-04-01 - 2026-05-25 15:00`), `Nakatani Foundation research grant` remains closed / next-cycle watch (`募集期間 2025-06-01 - 2025-07-07`), and `Secom General Research Grant` remains closed for the current cycle (`2026-03-31 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 19:03 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 19:03 JST` after `mind-upload@e1a7e7e2f22c`, `EEG-DATA@a7f9390492fd`, and `auto-research-funds@00cdbaa9a122` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support rather than widen the present bridge: `mind-upload` now deepens the `blood-CSF barrier / choroid-plexus` route split on human neurovascular pages outside the current six, `EEG-DATA` still reports `30,892` merged-unique rows, `28,855` high-confidence rows, and `24,880` directly usable rows in the current README snapshot, and `auto-research-funds` still keeps its latest summary at `8,590` aid IDs, `4,301` rows, and `3,951` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three support anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u7-2-timing-metric-route.html`; those checked pages returned `Last-Modified: Thu, 02 Apr 2026 09:37:54 GMT`, but their route-facing body wording still surfaced the earlier `18:06 JST` hold note. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check while updating the route-hold wording to the latest pulled heads. ## What still stays fixed after the 18:06 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 18:06 JST` after `mind-upload@85b6603b569b`, `EEG-DATA@a7f9390492fd`, and `auto-research-funds@b6c0d0f4eeb7` still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support rather than widen the present bridge: `mind-upload` only syncs `U7-2` public bridge wording, `EEG-DATA` deep-dives `OSF gazx2` confidence EEG metadata and `OpenNeuro ds007081` while now reporting `30,892` merged-unique rows, `28,855` high-confidence rows, and `24,880` directly usable rows in the current README snapshot, and `auto-research-funds` refreshes its README summary to `8,590` aid IDs, `4,301` rows, and `3,951` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the headline next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on the current `IEEE DataPort` pages for those three support anchors. - Browser-level live checks before this source sync returned `HTTP/2 200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u7-2-timing-metric-route.html`; those checked pages returned `Last-Modified: Thu, 02 Apr 2026 08:22:50 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive)`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = closed / next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync does **not** widen the current queue or claim surface. It only carries forward the same queue onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check. ## What still stays fixed after the 11:05 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 11:05 JST` after `mind-upload@208e59e2180c`, `EEG-DATA@00d85380f3fd`, and `auto-research-funds@f4ba35518400` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` refreshes the 10:07 route-hold packets, `EEG-DATA` deep-dives the maintained `ChineseEEG-2` release plus the public `auditory-eeg` family while still reporting `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,875` immediately usable rows, and `auto-research-funds` keeps the same practical shortlist without replacing the current `D10 / D03 / D02 / D01` family or the next-watch `D11 / D08 / D05 / D20` family. The speech-side public-open backup ladder is now clearer, but it still does not replace `D10` or fix the recall-validity gap that keeps `U13-5` bounded. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `Subscription Required` plus `LOGIN TO ACCESS DATASET FILES` on those three `IEEE DataPort` pages. - Browser-level live checks in this run returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages returned `Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, `Secom General Research Grant = closed (March 31, 2026 at 12:00 JST)`, and `Nakatani Foundation research grant = next-cycle watch`. - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the speech-side support reading. It does not widen the current queue or claim surface. ## What still stays fixed after the 11:09 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 11:09 JST` after `mind-upload@208e59e2180c`, `EEG-DATA@00d85380f3f`, and `auto-research-funds@f4ba35518400` still leaves both the current public six and the next-watch queue unchanged. - The current `mind-upload` head is the earlier 10:07 route-hold packet refresh itself, while the newest upstream movement is on `EEG-DATA`: `chore: deep-dive ChineseEEG-2 and PhysioNet auditory EEG`. The refreshed summary still reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,875` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - The newest public-open adjuncts only tighten row-specific backup coverage rather than widen the queue: `ds007591` and `ds007602` strengthen speech-side backup options for `U13-2` but still expose only three released participants each, `ChineseEEG-2` strengthens public reading/listening alignment coverage for `U13-5` but still does not expose the intended recall-labeled branch, and PhysioNet `auditory-eeg` is clearly public-open but remains single-day 4-channel coverage rather than a replacement for `D02` in `U0-2 / U0-3`. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages now returned `Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT`. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the backup-family reading after the newest `EEG-DATA` carry-forward. It does not widen the current queue or claim surface. ## What still stays fixed after the 10:07 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 10:07 JST` after `mind-upload@be507c810b11`, `EEG-DATA@3f20f48cca6e`, and `auto-research-funds@fb32c05163f4` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` refines EEG foundation setup-equivalence boundaries outside the current six, `EEG-DATA` deep-dives the HBN EEG release 11 route and now reports `30,887` merged-unique rows, `28,850` high-confidence rows, and `24,871` directly usable rows, and `auto-research-funds` keeps the same practical shortlist while its repository stats still read `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - The row-level bridge reading only tightens inside that unchanged queue: `U13-5` still keeps an explicit recall-validity caveat because the visible `D03` metadata still does not expose a recall-specific label, and `U14-4 / U14-2` still keep `D13` as the first public-open rerun support family beyond the current `D01` disclosure floor. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Thu, 02 Apr 2026 00:15:06 GMT`. - This source sync also re-aligns the public-side row wording and the funding-facing `60RQ` dossier wording to the same `Dxx + DOI + dataset name + access class` standard, so the bridge page, the deep dossiers, and the funding repo now point to the same canonical row packets again. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages and the canonical row packets. It does not widen the current queue or claim surface. ## What still stays fixed after the 09:05 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 09:05 JST` after `mind-upload@d7f30648fc40`, `EEG-DATA@ac8cc6fc8e74`, and `auto-research-funds@31ec17305f6a` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` tightens a literature myelin route split outside the current six, `EEG-DATA` adds the `aw8sz` deep dive and now reports `merged_unique=30886`, `high_confidence=28849`, and `access_counts_high.immediate=24500`, and `auto-research-funds` carries forward the `Aoi graduate scholarship` / `JSSF research grant` merges plus a README-stat refresh to `8,585` aid IDs, `4,293` rows, and `3,943` official-source rows without replacing the current `D10 / D03 / D02 / D01` family or the next-watch `D11 / D08 / D05 / D20` family. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors because a direct live-access reread still shows `IEEE DataPort` login and subscription gates on those three routes. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 23:29:12 GMT`, and the live pages still surfaced the earlier `04:09 JST` / `03:08 JST` reread notes before this source update. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, the `Kashinome Scholarship` official page still reads as the annual `mid-January to early-April` window, and `Secom General Research Grant` still shows the current cycle closed (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current queue or claim surface. ## What still stays fixed after the 03:08 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 03:08 JST` after `mind-upload@d391dbede29e`, `EEG-DATA@f9df9ba85a6`, and `auto-research-funds@95f804055809` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` splits ECM / PNN literature routes outside the current six, `EEG-DATA` adds two immediate-access deep-dive candidates (`10.48804/NV4RGL` and `10.7281/T1/B660D2`) without replacing the current `D10 / D03 / D02 / D01` family or the next-watch `D11 / D08 / D05 / D20` family, and `auto-research-funds` adds Gakusho / NII funding merges plus a README-stat refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 17:27:08 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current queue or claim surface. ## What still stays fixed after the 00:03 JST actual-pull reread on April 2, 2026 - An actual-pull recheck at `2026-04-02 00:03 JST` after `mind-upload@cff3abab58e8`, `EEG-DATA@a885ef3f029d`, and `auto-research-funds@0f60872538dc` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` tightens deuterium operating-point wording outside the current six, `EEG-DATA` adds the `DANDI 001187` deep dive and now reports `merged_unique=30875`, `high_confidence=28838`, and `access_counts_high.immediate=24492`, and `auto-research-funds` carries forward the `Isono / Okabe` scholarship refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 14:17:54 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 22:05 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 22:05 JST` after `mind-upload@84e5337`, `EEG-DATA@bbb8d6c63d7`, and `auto-research-funds@5ff33413e` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` clarifies clearance-route labels at the front door outside the current six, `EEG-DATA` refreshes deep-dive metadata while keeping `merged_unique=30873`, `high_confidence=28836`, `access_counts_high.immediate=24487`, and `18,312 / 28,832` experiment-facing rows (`63.51%` coverage), and `auto-research-funds` adds the `Yamaoka graduate scholarship` snapshot plus README-facing stats refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks before this source sync still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the checked pages also returned `Last-Modified: Wed, 01 Apr 2026 12:13:54 GMT`, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items, projects)` full-item audit still showed enough route coverage (`items=203`, `projects=2`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 18:05 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 18:05 JST` after `mind-upload@9984d0b`, `EEG-DATA@5fc1df00f07`, and `auto-research-funds@d7092c8e9` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` deepens wearable `OPM / MEG` route synchronization and measurement-stack clarification outside the current six, `EEG-DATA` adds a continuous-pursuit EEG BCI deep dive and now reports `merged_unique=30873`, `high_confidence=28836`, and `access_counts_high.immediate=24486`, its experiment-metadata report still covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` keeps the same practical shortlist after the recent carry-forward scholarship refresh. - Route-safe access wording also stays unchanged: the refreshed local `EEG-DATA` catalog keeps widening, but the live-access read remains stricter, so `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 08:22:51 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order before this run's new addendum. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 17:06 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 17:06 JST` after `mind-upload@c5a0550`, `EEG-DATA@82893f6ca6e`, and `auto-research-funds@ec6f7d068` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` deepens astrocyte PET route splits outside the current six, `EEG-DATA` deep-dives the KMI EEG dataset and now reports `merged_unique=30871`, `high_confidence=28834`, and `access_counts_high.immediate=24484`, its experiment-metadata report still covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` adds the `Megachips 2026 scholarship` snapshot plus a README-stat refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged: the refreshed local `EEG-DATA` catalog still renders `D03 / D02` as catalog-side immediate rows and `D01` as a mixed immediate/check-needed pair, but the live-access read remains stricter, so `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 07:16:09 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 14:09 JST actual-pull reread on April 1, 2026 - An actual-pull recheck at `2026-04-01 14:09 JST` after `mind-upload@ccef40f2f7cf`, `EEG-DATA@deefd5f95c6d`, and `auto-research-funds@f5f76c485ccb` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` clarifies presynaptic release-machinery ceilings outside the current six, `EEG-DATA` now reports `merged_unique=30869`, `high_confidence=28832`, and `access_counts_high.immediate=24482`, its new experiment-metadata report now covers `18,312 / 28,832` rows with at least one experiment-facing field (`63.51%` coverage), and `auto-research-funds` refreshes repo-level stats without changing the practical shortlist. - Route-safe access wording also stays unchanged: the refreshed local `EEG-DATA` catalog still renders `D03 / D02` as catalog-side immediate rows and `D01` as a mixed immediate/check-needed pair, but the live-access read remains stricter, so `D10` remains the only clear public-open primary anchor in the current six while `D03 / D02 / D01` remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 04:20:02 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle (`March 31, 2026 at 12:00 JST`). - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=5`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 12:06 JST actual-pull reread on April 1, 2026 - A second actual-pull recheck at `2026-04-01 12:06 JST` after `mind-upload@9f4bc8e760b1`, `EEG-DATA@1324f9e1ae2b`, and `auto-research-funds@6548b1650535` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` already keeps the route-hold wording public-safe, `EEG-DATA` now reports `merged_unique=30867`, `high_confidence=28830`, and `access_counts_high.immediate=24480`, and `auto-research-funds` refreshes funding reread documentation without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; the current `Last-Modified` header is `Wed, 01 Apr 2026 02:26:28 GMT` on those public surfaces, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, and `Secom General Research Grant` remains closed for the current cycle. - No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder. ## What still stays fixed after the 11:06 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 11:06 JST` after `mind-upload@aa21ab9855c1`, `EEG-DATA@cccd137a3468`, and `auto-research-funds@3a691196cb9f` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge: `mind-upload` already keeps the route-hold wording public-safe, `EEG-DATA` deepens repository-wide metadata and now reports `merged_unique=30866`, `high_confidence=28829`, and `access_counts_high.immediate=24479`, and `auto-research-funds` refreshes repo-level stats without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`; `Last-Modified` advanced to `Wed, 01 Apr 2026 01:21:12 GMT` for `issue.html` / `u8-1` and `Wed, 01 Apr 2026 01:21:13 GMT` for the two bridge pages, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 10:19 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 10:19 JST` after `mind-upload@d87b9ce`, `EEG-DATA@c05ceda146f8`, and `auto-research-funds@ca65b206cf6d` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge: `mind-upload` deepened a beginner glial substrate route audit outside the current public-six packet, `EEG-DATA` added an `OpenNeuro ds006036` deep dive that does not displace `D10 / D03 / D02 / D01` or the next-watch family `D11 / D08 / D05 / D20`, and `auto-research-funds` added `JCS / Takai / Korean scholarship` current cards without changing the practical shortlist. - Route-safe access wording also stays unchanged: `D10` remains the only clear public-open primary anchor in the current six, while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks at `2026-04-01 10:19 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 03:09 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 03:09 JST` after `mind-upload@31835fcd8daa`, `EEG-DATA@12eef8ca4ef0`, and `auto-research-funds@040e5b8798fd` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge: `mind-upload` split temporal routes for invasive language BCIs outside the current public-six packet, `EEG-DATA` added a semantic-text-relevance deep dive that widens language-related backup coverage without displacing `D10 / D03 / D02 / D01` or the next-watch family `D11 / D08 / D05 / D20`, and `auto-research-funds` refreshed `Obayashi / Yokogaku` cards without changing the practical shortlist. - Browser-level live checks at `2026-04-01 03:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `mind-upload-rq-solvability-bridge.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync(items)` full-item audit still showed enough route coverage (`items=203`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this session. ## What still stays fixed after the 01:06 JST live-source recheck on April 1, 2026 - A second no-op actual-pull recheck at `2026-04-01 01:06 JST` after nested `mind-upload@8da02e2e48e0`, `EEG-DATA@e6013384fa01`, and `auto-research-funds@c6a383f07a7b` still leaves both the current public six and the next-watch queue unchanged. - The current `EEG-DATA` head still supports the same narrow anchor families rather than replacing them: the current-six family `D10 / D03 / D02 / D01` and the next-watch family `D11 / D08 / D05 / D20` are all still present in the repo, and public-safe wording still keeps `D10` as the only clear public-open primary while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read stays stricter than the catalog label. - Browser-level live checks at `2026-04-01 01:06 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, `u8-1-closed-loop-delay-tolerance-route.html`, and `mind-upload-rq-solvability-bridge.html`, so this run still keeps the public batch fixed. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=204`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 00:12 JST actual-pull reread on April 1, 2026 - A latest actual-pull recheck at `2026-04-01 00:12 JST` after `mind-upload@e53a50b1256d`, `EEG-DATA@48f4814db5da`, and `auto-research-funds@76145d0e3f4c` still leaves both the current public six and the next-watch queue unchanged. - The current `EEG-DATA` head still supports the same narrow anchor families rather than replacing them: the current-six family `D10 / D03 / D02 / D01` and the next-watch family `D11 / D08 / D05 / D20` are all still present in the repo, but public-safe wording continues to keep `D10` as the only clear public-open primary while `D03 / D02 / D01` remain gated-support planning anchors because the live-access read and mirror state still stay mixed. - Browser-level live checks at `2026-04-01 00:15 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so this run keeps the public batch fixed and adds only a bounded reread note to the supporting route pages. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=204`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## How to read "solvable with EEG" on this page - `Close now` means a bounded benchmark, audit, or disclosure artifact that can be finished on one declared dataset family. - `Support only` means a useful anchor that still does not justify a stronger public-open route by itself. - When the live access audit and the catalog auto-label disagree, this page follows the live access audit for public-safe wording and keeps the catalog label only as a planning hint. - `External dependency` means a requirement that still needs theory work, language evaluation, legal judgment, clinical transfer, hardware validation, or broader community adoption outside this repository. - `Funding theme` means wording that still matches the present artifact level. It is not a promise that the larger mind-upload question is solved. ## What still stays fixed after the 21:09 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 21:09 JST` after `mind-upload@ed6f8203e46d`, `EEG-DATA@20fbbad9959f`, and `auto-research-funds@77f189662745` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge: `mind-upload` tightened dataset-benchmark object rules and clarified the FAQ RNA route split, `EEG-DATA` added request-gated `HBUED` emotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, and `auto-research-funds` added `Teraura Sayoko outbound scholarship`, `Gakusho scholarship`, and README-stat refreshes, but none of those changes replace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 21:09 JST` still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant`, `Secom General Research Grant`, and `Brain Science Foundation research grant` remain outside the current-cycle lane. - A fresh read-only Todoist `api/v1/sync` full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 19:07 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 19:07 JST` after `mind-upload@b7b6c0498ae1`, `EEG-DATA@24e85cc20f09`, and `auto-research-funds@0fddd53bd03c` still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge: `mind-upload` strengthened the front-door human-proxy split, `EEG-DATA` refreshed the catalog to `merged_unique=30860`, `high_confidence=28823`, and `access_counts_high.immediate=24471`, and `auto-research-funds` refreshed Kioxia/Takayanagi funding records, but none of those changes replace the current `D10 / D03 / D02 / D01` family or the outside-current-six order `U7-1 -> U1-2 -> U4-2 -> U8-1`. - Browser-level live checks at `2026-03-31 19:09 JST` still returned `200` for `issue.html` and `mind-upload-current-public-six-rq-brief.html`, and the live `issue.html` paragraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow: `Kura Fund = 2026-02-02 - 2026-04-17 17:00`, `Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00`, `Kashinome Scholarship = 2026-01-14 - 2026-04-09`, while `Nakatani Foundation research grant` and `Secom General Research Grant` are already closed for the current cycle. - A fresh read-only Todoist full-item audit still showed enough route coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Nakatani graduate scholarship=7`, `Kashinome=2`, `Secom=3`, `Brain Science Foundation=8`, `Okawa=2`, `Japan Industrial Science Research Institute=1`), so no new task was added in this session. ## What still stays fixed after the 17:06 JST post-pull reread on March 31, 2026 - A latest pull recheck at `2026-03-31 17:06 JST` after `mind-upload@4731680627ff`, `EEG-DATA@3e7a53d9ca8`, and `auto-research-funds@ef2924014a65` still leaves both the current public six and the next-watch queue unchanged. - The newest `EEG-DATA` additions widen the support map rather than the present bridge: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeuro `ds007146` adds a large auditory MEG/EEG/Ear-EEG record that still stays `uncertain_public` because the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage. - Recounting the `### Ux-y` headings in the RQ-by-RQ dossiers still returns `60`, so this run does not replace the one-row-at-a-time workflow with a flatter summary pass. - Browser-level live checks with a browser user agent still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`. - The practical funding reading therefore stays narrow: `Kura Fund`, `Nakatani Foundation graduate scholarship`, and `Kashinome Scholarship` remain the active bridge for the current six, `Secom General Research Grant` is already closed for the current cycle (`March 31, 2026 at 12:00 JST`) and stays only as a carried-forward watch record, and no new Todoist item was created in this session. ## What still stays fixed after the 16:32 JST metadata carry-forward reread on March 31, 2026 - A latest pull reread after `mind-upload@a11240d38415`, `EEG-DATA@3e7a53d9ca84`, and `auto-research-funds@c95cc61fdfc9` still leaves both the current public six and the next-watch queue unchanged. - `EEG-DATA`'s newest head is a metadata-deepening carry-forward rather than a route swap: the refreshed catalog now reports `merged_unique=30858`, `high_confidence=28821`, and `access_counts_high.immediate=24469`, which widens the backup-family search space but still does not replace the current `D10 / D03 / D02 / D01` family for the active route. - The practical access reading also stays conservative. The refreshed catalog still exposes `D01` through the DOI route as immediate and still keeps `D02` in the immediate/planning bucket, but the live public route continues to follow the stricter access audit and therefore keeps `D03 / D02 / D01` only as subscription-gated support anchors. - Browser-level live checks in this run still returned `200` for `issue.html`, `mind-upload-current-public-six-rq-brief.html`, and `u8-1-closed-loop-delay-tolerance-route.html`, so no extra public-front-page prose was added. - A fresh Todoist `api/v1/sync(items)` audit still showed enough coverage (`items=205`, `Kura=2`, `Nakatani family=11`, `Kashinome=2`, `Secom=3`, `Okawa=2`, `Japan Industrial Science Research Institute=1`, `AI for Aging-Society Problem Solving=0`), so no new task was added in this run. ## What stays fixed on March 31, 2026 - The current public six-question batch still stays `U13-2 -> U13-5 -> U0-2 -> U0-3 -> U14-4 -> U14-2`. - The next-watch queue still stays `U7-1 -> U1-2 -> U4-2 -> U8-1`. - If you want the exact next-watch row packets, continue with the [U7-1 route packet](/wiki/u7-1-synchronization-contract-route.html), the [U1-2 route packet](/wiki/u1-2-uncertainty-calibration-route.html), the [U4-2 route packet](/wiki/u4-2-minimal-causal-route.html), and the [U8-1 route packet](/wiki/u8-1-closed-loop-delay-tolerance-route.html). - Inside the current public six, `D10 3M-CPSEED` remains the only clearly public-open primary anchor. - `D03 Multimodal Fusion EEG + Eye-Tracking`, `D02 CSTE`, and `D01 Acquisition delay of wireless EEG` still remain subscription-gated support anchors on the public route. - No new Todoist task was needed in this run because the current practical lanes and watch lanes were already covered by existing tasks in the funding workflow. ## Why this page exists - The current public six brief is intentionally short. - The `RQ60` feasibility and dossier pages are intentionally wide. - This page is the bridge in between: it fixes the current execution queue and the next-watch queue at a row-by-row level without pretending that all `60RQ` items should be read at the same depth right now. ## Current public six | RQ | Main anchor now | What EEG can honestly close now | What still stays outside the claim | Funding theme that still fits | Lane that still fits now | Todoist | |---|---|---|---|---|---|---| | `U13-2` | `D10 3M-CPSEED` (`10.18112/openneuro.ds006465.v2.0.0`, immediate) | A bounded `brain-minus-prior` control table, mimic-separation note, and inconsistency audit for imagined speech. | Preserved internal mechanism, preserved identity, and any stronger mind-preservation wording. | `Neural-contribution audit for imagined speech with a brain-minus-prior control` | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | Existing tasks already cover the lane. No new item was added. | | `U13-5` | `D03 Multimodal Fusion EEG + Eye-Tracking` (`10.21227/6106-6120`, subscription-gated support) | A perception-to-recall degradation note and transfer-gap table under one bounded paired-stream route, with an explicit recall-validity caveat. | Any stronger mechanism-preservation reading or claim that a shared decoder implies a shared preserved mechanism. | `Perception-to-recall transfer-gap benchmark for mimic separation` | `Kura Fund`, then `Nakatani Foundation graduate scholarship` | Existing tasks already cover the lane. No new item was added. | | `U0-2` | `D02 CSTE` (`10.21227/j162-nh61`, subscription-gated support) | An `offset / jitter` distribution plus a `state-feature collapse` audit for a bounded identity-drift benchmark. | Legal, philosophical, or normative continuity claims. | `Temporal-validity-aware identity-drift audit with offset, jitter, and state-feature collapse` | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | Existing tasks already cover the lane. No new item was added. | | `U0-3` | `D02 CSTE` (`10.21227/j162-nh61`, subscription-gated support) | A threshold-stability note and overfit-exclusion rule on the same repeated-session floor as `U0-2`. | Treating a stable threshold as sufficient for personhood continuity or branch-identity resolution. | `Task-specific threshold stability and overfit-exclusion benchmark for identity drift` | `Nakatani Foundation graduate scholarship`, then `Kashinome Scholarship` | Existing tasks already cover the lane. No new item was added. | | `U14-4` | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, subscription-gated support) | Filled Model Card and Dataset Card examples for one bounded latency/disclosure floor, to be widened only with `D13`-backed rerun examples. | Field-wide reproducibility, standards adoption, or deployment readiness. | `Card-integrated reproducibility contract for the current public batch` | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | Existing tasks already cover the lane. No new item was added. | | `U14-2` | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, subscription-gated support) | A fixed-split rerun contract and negative-case trail for exploration-versus-confirmation discipline, to be widened only with `D13`-backed rerun examples. | Presenting exploratory outputs as confirmatory evidence or claiming broad rerun robustness. | `Fixed-split rerun contract for exploration versus confirmation` | `Kura Fund`; `Nakatani Foundation research grant` as next-cycle watch | Existing tasks already cover the lane. No new item was added. | ## Solve-first stacks inside the current public six | Stack | Current order | Why this stack stays narrow now | Main anchor family and first public-open support | |---|---|---|---| | Speech-side contribution stack | `U13-2 -> U13-5` | First keep neural contribution separate from the language prior, then ask where decoder transfer breaks when the route moves from perception to recall. | `D10` stays the first public-open floor; `D03` stays the paired-stream planning anchor; public-open backup remains `D10` plus `ZuCo 2.0` and the spoken/imagination robot-speech EEG family. | | Identity-drift floor | `U0-2 -> U0-3` | First bound timing drift and state-feature collapse, then ask whether the threshold rule survives once the timing floor is fixed. | `D02` stays the planning floor; the cleanest public-open stress tests remain `ds004148` and `ds007216`. | | Disclosure-to-rerun contract | `U14-4 -> U14-2` | First turn disclosure fields into filled card examples, then freeze the exploration-versus-confirmation split under one rerun contract. | `D01` stays the planning floor; `D13` remains the first public-open rerun family those two rows would need next, with `D08` kept for grounded validation-field examples. | The cleanest public-open support underneath those three stacks still stays outside the batch itself: `U7-1 -> U1-2` keeps the synchronization and inverse-uncertainty floor readable without forcing a batch switch. ## Public-open backup families for the current public six These backup families do not replace the current planning anchors. They only record the least-distorting public-open inspection path when the main planning anchor is gated. | RQ | Best public-open backup family | What it keeps testable | Why it still stays backup-only | |---|---|---|---| | `U13-5` | `D10 3M-CPSEED`, `ZuCo 2.0`, and `spoken + imagined robot-speech EEG` | Decoder-side transfer failure, a public EEG+ET paired-stream family, and speech-condition collapse can still be inspected without a gated paired-stream dataset. | None of these public-open families exposes a clean recall-labeled branch point, so the route still loses the reason `D03` stays primary in planning. | | `U0-2` | `A test-retest resting and cognitive state EEG dataset`, then `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` | Retest drift and provenance-sensitive timing failure can still be stress-tested on public-open families. | The route still loses the direct `cross-session / cross-task biometrics` framing that keeps `D02` primary in planning. | | `U0-3` | `A test-retest resting and cognitive state EEG dataset`, then `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` | Threshold drift can still be checked under public-open retest and multi-session ladders. | The route still loses the cleanest intended identity-drift floor, so the result remains backup-only. | | `U14-4` | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications`, then `D08 Simultaneous human intracerebral stimulation and HD-EEG` | The card contract can still be illustrated with the first required public-open rerun family plus grounded validation-field examples. | These families help only after the first disclosure contract is fixed; they do not replace the narrower latency-first planning anchor, but `D13` is the support family the row would need next. | | `U14-2` | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications`, then `D08 Simultaneous human intracerebral stimulation and HD-EEG` | Split-violation examples and validation-heavy failure trails can still be illustrated on public-open datasets. | They widen rerun examples later, but they do not replace the latency-first split boundary that keeps `D01` primary in planning. | ## Exact dataset family to use before stronger wording The tables above fix the present route at the level of one primary anchor per row. The table below answers the more operational question that comes next: which nearby `EEG-DATA` family should stay on deck before the row is widened or submitted with stronger wording. ### For the current public six | RQ | Primary anchor to code first | Support family to keep nearby | Why the support family still stays secondary | |---|---|---|---| | `U13-2` | `D10 3M-CPSEED` (`10.18112/openneuro.ds006465.v2.0.0`, immediate) | `EEG data recorded during spoken and imagined speech interaction with a simulated robot` (`10.5281/zenodo.14645652`, immediate), `D03 Multimodal Fusion EEG + Eye-Tracking` (`10.21227/6106-6120`, gated), and `D09 VICODEV` (`10.21227/r8fc-2y40`, gated) | They help later control-family design, multimodal comparison, or speech-side stress tests, but none keeps the same clean `overt / silent-intended / imagined` ladder as `D10` for the first public artifact. | | `U13-5` | `D03 Multimodal Fusion EEG + Eye-Tracking` (`10.21227/6106-6120`, gated support) | `D10 3M-CPSEED` (`10.18112/openneuro.ds006465.v2.0.0`, immediate), `ZuCo 2.0` (`https://osf.io/2urht`, immediate public EEG+ET family), and `EEG data recorded during spoken and imagined speech interaction with a simulated robot` (`10.5281/zenodo.14645652`, immediate) | They are useful for speech-side transfer stress tests and public EEG+ET inspection, but none exposes a clean recall-labeled branch point, so the present row still cannot close without an external recall-validity layer. | | `U0-2` | `D02 CSTE` (`10.21227/j162-nh61`, gated support) | `A test-retest resting and cognitive state EEG dataset` (`10.18112/openneuro.ds004148.v1.0.1`, immediate) and `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) | They are stronger public-open stress-test families for retest ladders and synchronization logging, but they are not as direct a `cross-session / cross-task biometrics` floor as `D02`. | | `U0-3` | `D02 CSTE` (`10.21227/j162-nh61`, gated support) | `A test-retest resting and cognitive state EEG dataset` (`10.18112/openneuro.ds004148.v1.0.1`, immediate) and `A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) | They are the right adjuncts once the threshold rule needs a richer session-external retest ladder, but they still do not replace `D02` as the narrowest identity-drift floor. | | `U14-4` | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, gated support) | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications` (`10.17632/vyczny2r4w`, immediate) and `D08 Simultaneous human intracerebral stimulation and HD-EEG` (`10.21227/7may-9q56`, access-mixed) | They are better for richer rerun examples and leak-audit design once the first card fields are fixed. `D13` is the first public-open support family the row would need next, but it still does not replace `D01` as the latency/disclosure floor. | | `U14-2` | `D01 Acquisition delay of wireless EEG` (`10.21227/dv1p-vq18`, gated support) | `D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications` (`10.17632/vyczny2r4w`, immediate) and `D08 Simultaneous human intracerebral stimulation and HD-EEG` (`10.21227/7may-9q56`, access-mixed) | They are the right adjuncts for split-violation examples and broader rerun families. `D13` is the first public-open support family the row would need next, but the first bounded split contract still reads most cleanly on the narrower latency route. | ### For the next-watch queue | RQ | Primary anchor to code first | Support family to keep nearby | Why the support family still stays secondary | |---|---|---|---| | `U7-1` | `D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) | `D15 A simultaneous EEG-fNIRS dataset for investigating working memory load` (`10.21227/tswy-m550`, immediate) and `D23 EEG, PPG, GSR Multimodal Physiological Signals for Rehabilitation Fatigue Detection` (`10.6084/m9.figshare.31169026`, immediate) | They are useful for multimodal stress tests after the four-field contract is fixed, but neither matches `D11` on provenance richness and session structure for the first synchronization packet. | | `U1-2` | `D08 Simultaneous human intracerebral stimulation and HD-EEG` (`10.21227/7may-9q56`, public DOI handoff `10.25493/NXN2-05W`) | `D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) and `D19 CerebellarTMSEEGData` (`10.6084/m9.figshare.13082495`, immediate) | They are strong perturbation-family cross-checks, but they do not replace the direct `ground-truth + intervention + inverse-validation` role of `D08`. | | `U4-2` | `D05 EEG cortical responses after HiPi` (`10.21227/8snc-7h06`, immediate) | `D08 Simultaneous human intracerebral stimulation and HD-EEG` (`10.21227/7may-9q56`, access-mixed) and `D19 CerebellarTMSEEGData` (`10.6084/m9.figshare.13082495`, immediate) | They are better for known-site or second-family perturbation checks after the first causal sign-agreement rule is fixed, but they are less minimal than `D05` for the first rebuttal gate. | | `U8-1` | `D20 Closed-loop auditory stimulation targeting REM oscillations` (`10.5281/zenodo.10663994`, immediate) | `D21 NeuroSimo: closed-loop EEG/EMG-guided TMS` (`10.5281/zenodo.14398633`, immediate) and `D12 Longitudinal MI-BCI training with transcutaneous spinal stimulation` (`10.5281/zenodo.15454354`, immediate) | They are the right support families for trigger/recovery cross-checks and retraining burden, but `D20` remains the cleanest public-open first anchor for one bounded delay-tolerance packet. | ## Next-watch queue and adjacent support packets outside the current public six The headline next-watch queue still stays `U7-1 / U1-2 / U4-2 / U8-1`. `U7-2` is listed below as an adjacent support packet inside the same synchronization family, not as a queue replacement. | RQ | Main anchor now | What EEG can honestly close next | What still stays outside the claim | Funding theme that still fits | Watch lane | Todoist | |---|---|---|---|---|---|---| | `U7-1` | `D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) | A four-field synchronization contract, offset/jitter audit, and reanalysis-success note. | Device-wide standard adoption and any claim that synchronization logging alone solves validity. | `A public-open synchronization and QC contract for multimodal EEG verification in the mind-upload route` | `Okawa Foundation research grant` (`watch`) | Existing watch tasks already cover the lane. No new item was added. | | `U7-2` | `D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling` (`10.18112/openneuro.ds007216.v1.0.0`, immediate) | An explicit `offset median / jitter p95 / peak-latency drift / reanalysis agreement` metric bundle plus release-block thresholds for the same synchronization family. | Any claim that those thresholds alone solve validity, establish field-wide standards, or remove broader hardware-truth requirements. | `Release-block timing metrics for public-open multimodal EEG synchronization in the mind-upload route` | `Okawa Foundation research grant` (`watch`) | Existing watch tasks already cover the lane. No new item was added. | | `U1-2` | `D08 Simultaneous human intracerebral stimulation and HD-EEG` (`10.21227/7may-9q56`, public DOI handoff `10.25493/NXN2-05W`) | An inverse uncertainty-calibration report, coverage-stability table, and downgrade rule under repeated perturbations. | Any claim that one stable inverse route already proves full recoverability or preserved mechanism. | `Perturbation-tested uncertainty calibration for inverse EEG estimates in the mind-upload verification route` | `Brain Science Foundation research grant` (`watch`), `Nakatani Foundation research grant` (`next-cycle watch`) | Existing watch tasks already cover the lane. No new item was added. | | `U4-2` | `D05 EEG cortical responses after HiPi` (`10.21227/8snc-7h06`, immediate) | A minimal intervention protocol, sign-agreement table, and rebuttal boundary for one narrow causal packet. | Broader theory ranking, global causal-equivalence claims, and any preserved-identity reading. | `Minimal causal-intervention benchmark for reproducible EEG verification in the mind-upload route` | `Brain Science Foundation research grant` (`watch`), `Nakatani Foundation research grant` (`next-cycle watch`) | Existing watch tasks already cover the lane. No new item was added. | | `U8-1` | `D20 Closed-loop auditory stimulation targeting REM oscillations` (`10.5281/zenodo.10663994`, immediate) | A closed-loop safety KPI dashboard, delay-tolerance band note, and downgrade rule for one named loop family. | Universal loop thresholds, chronic deployment claims, and any identity-relevant controller reading. | `Operational delay-tolerance and safety-stop dashboard for closed-loop EEG control in the mind-upload route` | `Japan Industrial Science Research Institute research grant` (`watch`), `Nakatani Foundation research grant` (`next-cycle watch`) | Existing watch tasks already cover the lane. No new item was added. | ## Funding windows that still matter right now - `Kura Fund` remains open through `April 17, 2026 at 17:00`. - `Nakatani Foundation graduate scholarship` runs from `April 1, 2026` through `May 25, 2026 at 15:00`. - `Kashinome Scholarship` remains open through `April 9, 2026`. - `Secom General Research Grant` is already closed for the current cycle (`March 31, 2026 at 12:00 JST`) and now stays only as a carried-forward watch record. - `Brain Science Foundation research grant`, `Okawa Foundation research grant`, `Japan Industrial Science Research Institute research grant`, and `Nakatani Foundation research grant` stay in watch or next-cycle-watch mode for the outside-current-six queue. ## What still does not become true just because this page exists - It does not turn the wider `60RQ` map into a same-depth execution queue. - It does not raise the public claim ceiling above bounded benchmark, audit, and disclosure artifacts. - It does not move theory, law, neurorights, chronic deployment, or full identity questions into an EEG-only solved state.